Presentation is loading. Please wait.

Presentation is loading. Please wait.

4” Diameter tube inserted into 21” riser at the seafloor (5000’) New riser allowing flow to the drillship Enterprise Oil separated & shipped ashore System.

Similar presentations


Presentation on theme: "4” Diameter tube inserted into 21” riser at the seafloor (5000’) New riser allowing flow to the drillship Enterprise Oil separated & shipped ashore System."— Presentation transcript:

1 4” Diameter tube inserted into 21” riser at the seafloor (5000’) New riser allowing flow to the drillship Enterprise Oil separated & shipped ashore System designed to minimize the formation of hydrates Riser tube will also be equipped with methanol injection system to control hydrates Enterprise is capable of processing 15,000 bbls / day and can store 139,000 bbls Support barge is capable of storing 137,000 bbls Riser Insertion Tube

2 Blowout Preventer - Top Kill

3

4 The Incident Command Posts Unified Source Control – Houston Tx. Stack Intervention −Top Kill −Swing Valve −Split Stack Containment −Top hat −Hot tap Relief Wells −DD II −DD III Longer Term Options

5 The On-Site Command Post Tactical Response Team (TRT) – MC 252


Download ppt "4” Diameter tube inserted into 21” riser at the seafloor (5000’) New riser allowing flow to the drillship Enterprise Oil separated & shipped ashore System."

Similar presentations


Ads by Google