Presentation is loading. Please wait.

Presentation is loading. Please wait.

Mrs. Karen Garrity Dr. Diane M. Clancy

Similar presentations


Presentation on theme: "Mrs. Karen Garrity Dr. Diane M. Clancy"— Presentation transcript:

1 Mrs. Karen Garrity Dr. Diane M. Clancy
Launching a Pre-K to 12 systemic approach to Project Based Learning in a Technology Rich Environment Mrs. Karen Garrity Dr. Diane M. Clancy

2 Welcome Introductions
Purpose: This presentation will recreate the process, timeline, and organization of implementing a wall-to-wall Project Based Learning (PBL) environment.

3 How do we restructure two high poverty, low performing elementary schools into high achieving schools as a part of a PreK – 12 PBL pathway? Demographics Lincoln/Fodrea Student Performance New Tech Visits lead to Prek – 12 pathway Change to driving questions

4 Fodrea Data First two years of data for CSA Fodrea
Last two years of data for Fodrea Community School First two years of data for CSA Fodrea Fodrea Com. Language Arts 3rd 4th 2008 2009 All Students 57 60 63 47 ESL Special Ed. 20 27 25 17 Free/Rd 49 56 67 50 Math 53 36 61 44 33 46 31 43 CSA Fodrea Language Arts 3rd 4th 2011 2012 All Students 71 92 68 94 ESL  67  73 67   100 Special Ed.  63  50 Free/Rd  69  95 65   88 Math 58 88 60 90  33  82  75  85

5 Fodrea Community School vs CSA Fodrea
Language Arts 5th 6th 2008 2009 All Students 54 55 38 48 ESL Special Ed. 20 30 13 Free/Rd 47 58 33 44 43 52 39 8 45 46 CSA Fodrea Language Arts Old Fodrea Closed 5th 6th 2011 2012 All Students 70 94 39 ESL  50  100 Special Ed.  17  83 Free/Rd  58  78  40  88 77 89 78  75  33  0 77   82

6 Columbus Signature Academy Fodrea Campus
Restructure student population to align with district wide demographics Demographics 50% F/R 14% Special Ed. 10% ESL Last two years of ISTEP data

7 Staffing a PBL School Principal Design Team
Impact of choosing facilitators – matching instructional style with instructional strategy – PBL K-12 monthly meetings Vertical & Horizontal Articulation Critical Friends Protocol Training

8 Stations & Standards Stations UDL Individualization Homogeneous & heterogeneous Remediation Enrichment Large group instruction vs. group work Facilitator at a station – reteaching/follow-up Common Core Standards

9 Presentation to Cummins for funding to install playground equipment.
Project Design Template – See Handout Voice, Choice, Interests Rigor, Relevance, Relationships Authentic, engaging learning Students understand the need and retain the information Integrated curriculum Interaction with community Presentation to Cummins for funding to install playground equipment.

10 21st Century Skills Communication Collaboration Technology
Problem Solving Critical Thinking Creativity Take Rubric, UDL umbrella, Project template, sample project, sample integrated curriculum maps bring list of dates International Tulip Bulb Project

11 Formative Assessments
Assessment data drives instruction Acuity Data mCLASS/Wireless Generation/Diebels District Writing Prompt Results Star Reading

12 Link to 1st Grade Monster Jam project for Henryville, IN
Projects in Action Field Day Link to 1st Grade Monster Jam project for Henryville, IN

13 Closing Incubator for best practices
Greater impact on learning without increasing funding Less need for remediation Staff time can be reallocated Questions???

14 Contact Information Mrs. Karen Garrity Dr. Diane M. Clancy


Download ppt "Mrs. Karen Garrity Dr. Diane M. Clancy"

Similar presentations


Ads by Google