1 Industry LNG Seminar Institute of Mechanical Engineers 11 February 2009 Abdulrahman Al Mannai Commercial Manager

2 Qatargas II Supply Chain North Field Gas Production Onshore Liquefaction (2*7.8 MTPA Trains) Shipping. Q-Flex (~215 km 3 ), Q-Max (~265 km 3 ) Regasification. South Hook can process up to 15.6 MTPA lean LNG (21 bcma gas) Gas LNG Gas to Pipeline

3 Industry LNG Seminar – Institute of Mechanical Engineers 3 Background – South Hook Terminal South Hook LNG Terminal Company Ltd is a joint venture between subsidiaries of: South Hook Facilities designed and constructed in two phases  Each Phase with an annual gas redelivery capability of ~10.5 bcma  To match the capacity of the Qatargas II upstream facilities SHLNG has been granted exemption from regulated Third Party Access for both phases of capacity and a duration of 25 years from commercial start date.  Enabled South Hook Gas to purchase all primary capacity for QGII LNG (67.5%) (24.15%)(8.35%)

4 Commercial Relationships QatarUnited Kingdom ExxonMobil Gas Marketing Europe Limited LNG GAS

5 Industry LNG Seminar – Institute of Mechanical Engineers 5 Capacity Timeline Base Firm Redelivery Capacity South Hook Bundles (SHB) SHG purchased All Terminal Firm Capacity Base Firm Redelivery Capacity D-14 SHLNGSHG Capacity Sale Third Party Services Daily Interruptible Capacity Terminal Operator Services “UIOLI” SHB QGII SHG & Additional Users SHG & Additional Users

6 Industry LNG Seminar – Institute of Mechanical Engineers 6 South Hook Bundles time space capacity Secondary capacity sales will be in the form of South Hook Bundles (“SHB”) that will specify  Berthing slot date  Temporary LNG tank storage space  Redelivery capacity  LNG quality SHBs can be advertised for re-sale on our Electronic Bulletin Board time

7 Industry LNG Seminar – Institute of Mechanical Engineers 7 Redelivery profile Terminal Operator “UIOLI” Services Advertised on the website 14 days ahead of a berthing slot Auctioned over 4 days ending 10 days before the berthing slot. Gas redelivered over a 7 day period Users apply via EBB. “UIOLI” SHB example 1 “UIOLI” SHB example 2 Redelivery profile Berthing time LNG Space Berthing time LNG Space

8 Industry LNG Seminar – Institute of Mechanical Engineers 8 Terminal Operator “UIOLI” Services (cont.) Terminal Operator facilitates the optimisation of unused redelivery capacity Users allowed to nominate above their firm capacity Unused redelivery capacity on the day will be recycled and allocated as interruptible capacity for other Users Allocation is pro rata to firm capacity rights Interruptible Capacity time Aggregate nominations Unused capacity Available Capacity

9 Industry LNG Seminar – Institute of Mechanical Engineers 9 Commissioning Schedule The first commissioning cargo “Tembek” has left the Arabian Gulf en route for Milford Haven. Commissioning is an intensive activity, commercial operations (Phase 1) is currently forecast to commence in the second half of April  Sendout is under the control of the Terminal Operator during this period  SHLNG will provide schedule updates on its website Commissioning process ongoing

10 Industry LNG Seminar – Institute of Mechanical Engineers 10 Application To Become a User A party will need to apply and be accepted as a User of the terminal before it can hold capacity. A Confidentiality Agreement will need to be signed before all other relevant documents are released SHLNG to publish the steps required to become a User on its website during March 2009 www.southhooklng.com Parties interested in the products and services available from SHG should contact Donovan Waite, Head of Trading and Business Development www.southhookgas.com


Download ppt "Industry LNG Seminar Institute of Mechanical Engineers 11 February 2009 Abdulrahman Al Mannai Commercial Manager."

Similar presentations


Ads by Google