Download presentation
Presentation is loading. Please wait.
Published byEduardo Lemay Modified over 9 years ago
1
Seven years ago the Friends of South Slough (FOSS) began a special initiative called “FOSS Floats!” The goal was to embark on a series of projects that would create opportunities to experience the estuary from our waterways as well as the SSNERR trail system.
2
“FOSS Floats!” has accomplished two exciting projects since the initiative began. The first project was the 75’ long pedestrian bridge that now extends our estuary study trail system across a tidal inlet. The second project was the purchase and donation of a 24’, eight-passenger, PacNW native american styled fiberglass canoe.
3
The next “FOSS FLOATS!” Project: The Float House Project-- A logical next step in expanding the SSNERR study trail system to include the water- bourne perspective of the estuary. Comprises two concurrent subprojects: -mooring dock with paddling portage point -detachable/towable floating classroom
4
Proposed location for mooring dock & paddle trip embarcation & disembarcation access
6
Float House architecture and structure to be inspired by our Coos Bay Cultural Heritage & History
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.