Presentation is loading. Please wait.

Presentation is loading. Please wait.

WIP-PAT Best Practice Visit Highlights Paul Grayston 5 August 2004.

Similar presentations


Presentation on theme: "WIP-PAT Best Practice Visit Highlights Paul Grayston 5 August 2004."— Presentation transcript:

1 WIP-PAT Best Practice Visit Highlights Paul Grayston 5 August 2004

2 Visit Locations 5 and 6 July 2004 Gothenburg, Sweden Tampere, Finland Helsinki, Finland 21 and 22 July 2004 Densitron Ferrograph Factory, Newcastle, UK Newcastle, UK Chorley, Lancashire, UK Manchester Airport, UK

3 Gothenburg 549 Buses 18 Regional Train lines 204 Trams 26 Ferries Fully integrated system Widespread real-time information systems provided by GoTiC Project

4 Gothenburg Good Fixed information everywhere

5 Gothenburg Real Time information at most stops

6 Gothenburg At Interchange points colour coded displays

7 Gothenburg Rail and Bus station link together seamlessly

8 Gothenburg Not everything is right though

9 Tampere 300 buses Tram/Train plans PARAS system for communications between smartcard system, traffic signals and PT vehicles You never use enough time on specifications System designed to operate at - 40°C

10 Tampere Outdoor signs for a group of stops

11 Tampere Customer profiling from Smartcard system Web and mobile services part of the system

12 Helsinki - Tikkurilla Outdoor real time departure sign


Download ppt "WIP-PAT Best Practice Visit Highlights Paul Grayston 5 August 2004."

Similar presentations


Ads by Google