Trim Shop - Typical Way A Better Way 123D Optimization 3D 2D 1D 2nd-Slits 1st-Cut 3rd-Shear FLOW 3D 2D 1 st -Cut 2nd-Slits 1st-Shears FLOW Flat Sheets.

Similar presentations


Presentation on theme: "Trim Shop - Typical Way A Better Way 123D Optimization 3D 2D 1D 2nd-Slits 1st-Cut 3rd-Shear FLOW 3D 2D 1 st -Cut 2nd-Slits 1st-Shears FLOW Flat Sheets."— Presentation transcript:

1

2 Trim Shop - Typical Way

3 A Better Way

4 123D Optimization 3D 2D 1D 2nd-Slits 1st-Cut 3rd-Shear FLOW 3D 2D 1 st -Cut 2nd-Slits 1st-Shears FLOW Flat Sheets FLOW Potential Scrap

5

6 3D Optimization Where to Place the Parts to Minimize Scrap and Instruct Machine Where to Cut/Slit and/or Shear FLOW COIL Blanks Needed to Make Parts Cut 6 4 5 7 2 1 3 Potential Scrap

7 3D Optimization FLOW Blanks Needed to Make Parts Slits 6 4 5 7 3 1 2 6 4 5 7 2 1 3 Potential Scrap Slitting Process

8 3D Optimization Where to Place the Parts to Minimize Scrap and Instruct Machine Where to Cut/Slit and/or Shear FLOW Blanks Needed to Make Parts 6 4 5 7 3 1 2 6 4 5 7 2 1 3 Potential Scrap Remove Good Blanks

9 3D Optimization 3D FLOW Potential Scrap Blanks Needed to Make Parts 1 2 6 4 5 7 2 1 3 1 2 Shear Shearing Process

10 3D Optimization 3D Blanks Needed to Make Parts 6 4 5 7 2 1 3 6 4 5 7 2 1 3 Parts Created

11 Cut Blank Slit Pattern Sorting Shearing and Sorting 3D Optimization- Slitting, Shearing & Sorting 320360 503 403 1476 1480 701 801 1200

12

13 2D Optimization Where to Place the Parts to Minimize Scrap and Instruct Machine Where to Cut/Slit and/or Shear FLOW COIL Blanks Needed to Make Parts Cut 6 Potential Scrap 7 1 3 4 2 5 8 Cut

14 2D Optimization Where to Place the Parts to Minimize Scrap and Instruct Machine Where to Cut/Slit and/or Shear FLOW Blanks Needed to Make Parts 6 Potential Scrap 7 1 3 4 2 5 8 4 1 3 2 Slits 8 7 6 5 Slitting Process

15 2D Optimization Where to Place the Parts to Minimize Scrap and Instruct Machine Where to Cut/Slit and/or Shear Blanks Needed to Make Parts 6 Potential Scrap 7 1 3 4 2 5 8 4 1 3 2 8 7 65 Remove Scrap

16 2D Optimization Where to Place the Parts to Minimize Scrap and Instruct Machine Where to Cut/Slit and/or Shear Blanks Needed to Make Parts 6 7 1 3 4 2 5 8 6 7 1 3 4 2 5 8 Parts Created

17

18 1D Optimization Where to Place the Parts to Minimize Scrap and Instruct Machine Where to Cut/Slit and/or Shear FLOW Blanks Needed to Make Parts 6 Potential Scrap 7 1 3 4 2 5 8 Flat Sheer 4 1 3 2 Shear First Run of Shearing

19 1D Optimization FLOW Blanks Needed to Make Parts 6 Potential Scrap 7 1 3 4 2 5 8 8 7 65 Shear Flat Sheet

20 1D Optimization Parts Needed 6 7 1 3 4 2 5 8 6 7 1 3 4 2 5 8 Parts Created


Download ppt "Trim Shop - Typical Way A Better Way 123D Optimization 3D 2D 1D 2nd-Slits 1st-Cut 3rd-Shear FLOW 3D 2D 1 st -Cut 2nd-Slits 1st-Shears FLOW Flat Sheets."