Presentation is loading. Please wait.

Presentation is loading. Please wait.

Přečerpávací vodní elektrárna Dlouhé Stráně ČEZ, a. s., Vodní elektrárny The Dlouhé Stráně Pumped-Storage Hydro Power Station ČEZ Group, Hydroelectric.

Similar presentations


Presentation on theme: "Přečerpávací vodní elektrárna Dlouhé Stráně ČEZ, a. s., Vodní elektrárny The Dlouhé Stráně Pumped-Storage Hydro Power Station ČEZ Group, Hydroelectric."— Presentation transcript:

1 Přečerpávací vodní elektrárna Dlouhé Stráně ČEZ, a. s., Vodní elektrárny The Dlouhé Stráně Pumped-Storage Hydro Power Station ČEZ Group, Hydroelectric Power Stations The winner of the „Czech 7 wonders“ public poll

2 1 13 BROWN-COAL 1 HEATING 1 BLACK-COAL 13 HYDROELECTRIC 3 PUMPED-STORAGE 2 NUCLEAR ČEZ GROUP - POWERPLANTS 1 WIND DLOUHÉ STRÁNĚ I, II POŘÍČÍ II DVŮR KRÁLOVÉ CHVALETICE HODONÍN DALEŠICE MOHELNO DUKOVANY TEMELÍN LIPNO I, II HNĚVKOVICE Č. BUDĚJOVICE KOŘENSKO II KOŘENSKO I ORLÍK KAMÝK SLAPY ŠTĚCHOVICE I ŠTĚCHOVICE II VRANÉ PRAHA PLZEŇ KARLOVY VARY ÚSTÍ nad LABEM MĚLNÍK II, III TISOVÁ I, II PRUNÉŘOV I, II TUŠIMICE II ŽELINA POČERADY LEDVICE II, III DĚTMAROVICE MRAVENEČNÍK OSTRAVA BRNO ZLÍN HR. KRÁLOVÉ PARDUBICE MĚLNÍK DUKOVANY Pumped-Storage Power Station Dlouhé Stráně Where do you find us in the Czech Republic?

3 2 Where do you find us in the Olomouc Region? Visitor centre of the Pumped-Storage Power Station Dlouhé Stráně

4 3 Location: Kouty nad Desnou River: Divoká Desná Altitude of the generator room: 767,20 MASL Construction on the power station started:1978 Date of commissioning: 1996 Energy used capacity: 2 580 MM cubic meters Installed capacity: 2 x 325 MW Head of power station: 534,3 m (the largest of a reversing turbine in Europe) Type of turbine: Francis (reversing) Turbine discharge (max): 68,5 cubic meters/sec Effectivity of the pumped-storage cycle:75,1 % The elevated storage reservoir spot height of the dam crest: 1 350 MASL length of the dam crest: 1 742,5 MASL total capacity: 2 720 MM cubic meters max surface submerged: 15,4 ha The lower reservoir spot height of the dam crest: 824,7 MASL length of the dam crest in the centre line:306 m total capacity : 3,405 MM cubic meters max surface submerged: 16,13 ha Basic technical data

5 4 Significance of a power station - power station works in quick start regime and by spotting the deviation of the energy system - it helps to optimize the operation of nuclear and coal-fired power plants Coal + Nuclear

6 5 it has later become one of the most touristic attractions in the Czech republic. It would have been refused by the public during the construction,

7 6 History of the construction of the power station 1978 – construction of the power station started1978 – construction of the power station started 1980‘s – then central bodies held up the project1980‘s – then central bodies held up the project 1985 – modernization of the project1985 – modernization of the project 1996 – date of commissioning1996 – date of commissioning

8 7 Environmental impact of the construction and operation of the power station Environmental impact - entire technology is located underground - technology used with no negative side effects on environment - all service water is being purified - landscape intervention caused by the construction of the power station has had no negative impact on the surrounding ecosystem - recultivation which followed the construction incorporated the power station in the natural surroundings

9 8 Further importance of the hydroelectric plant - popular tourist spot - tourist routes and cycle paths - positive effects on the development of tourism in the Desná Valley X - visit rate regulation due to the Protected landscape area of Jeseniky (need for close cooperation with the environmentalists) - cooperation with regional tourist development organizations and public administration

10 9 Public visits start at the Visitor center Visit rate of the visitor centre: approx. 60 000 visitors per year

11 10 And they continue to the Power Station „There is a machine unit placed deep in the underground of the mountain which rotates and produces the valuable electricity“.

12 11 Let‘s have a look in the generator room All technology is located 250 m underground = minimum impact on the environment

13 12 The uper reservoir – significant tourist spot Altitude of 1 350 MASL – Beautiful scenery of main Jeseniky Mountains edge

14 13 Thank you for your attention Zdeněk Saturka zdenek.saturka@cez.cz


Download ppt "Přečerpávací vodní elektrárna Dlouhé Stráně ČEZ, a. s., Vodní elektrárny The Dlouhé Stráně Pumped-Storage Hydro Power Station ČEZ Group, Hydroelectric."

Similar presentations


Ads by Google