Date: 21.08.2014, Page 1 Work Processes for the PCA Special Interest Groups (SIG’s) Magne Valen-Sendstad POSC Caesar Association (PCA)

Similar presentations


Presentation on theme: "Date: 21.08.2014, Page 1 Work Processes for the PCA Special Interest Groups (SIG’s) Magne Valen-Sendstad POSC Caesar Association (PCA)"— Presentation transcript:

1 Date: 21.08.2014, Page 1 Work Processes for the PCA Special Interest Groups (SIG’s) Magne Valen-Sendstad POSC Caesar Association (PCA)

2 Date: 21.08.2014, Page 2 ISO 15926 - Data Model and Reference Data Library RDL Common Terminology Core Classes Standard Classes Proprietary Classes Standardised in ISO 15926-2 Product Catalogues represented using ISO 15926 Standardised in ISO 15926-4 Physical Object, Activity, Property Classes Standardised by e.g. ISO /IEC/ ANSI/ BS/DIN, represented using ISO 15926 Data Model Part 4 +(Part 3) (SC4 RDDB scope) + Part 5 and 6 for the process

3 Date: 21.08.2014, Page 3 ISO 15926-4 Initial Set (Subject to Maintenance) l ISO-TS 15926-4 ACTIVITY PROPOSED SET l ISO-TS 15926-4 BASICS PROPOSED SET l ISO-TS 15926-4 CLASS OF CLASS PROPOSED SET l ISO-TS 15926-4 CONNECTION MATERIAL PROPOSED SET l ISO-TS 15926-4 CONTROL FUNCTION PROPOSED SET l ISO-TS 15926-4 ELECTRICAL PROPOSED SET l ISO-TS 15926-4 ENCODED INFORMATION PROPOSED SET l ISO-TS 15926-4 HEAT TRANSFER PROPOSED SET l ISO-TS 15926-4 INFORMATION PROPOSED SET l ISO-TS 15926-4 INSTRUMENT PROPOSED SET l ISO-TS 15926-4 PIPING PROPOSED SET l ISO-TS 15926-4 PROPERTY PROPOSED SET l ISO-TS 15926-4 PROTECTION PROPOSED SET l ISO-TS 15926-4 ROTATING EQUIPMENT PROPOSED SET l ISO-TS 15926-4 SOLID HANDLING PROPOSED SET l ISO-TS 15926-4 STATIC EQUIPMENT PROPOSED SET l ISO-TS 15926-4 TRANSPORT PROPOSED SET l ISO-TS 15926-4 UOM PROPOSED SET l ISO-TS 15926-4 VALVES PROPOSED SET PCA will form SIG’s to at a minimum cover this scope

4 Date: 21.08.2014, Page 4 The ISO Position

5 ISO TC184/SC4/WG3 Ibusuki N000 2007-07-06 5 The Maintenance and the Validation Teams Maintenance Team –A group of experts that may be set up by a parent committee following the rules in the ISO/IEC Directives for the establishment of Working Groups –A MT may be called upon by the TC/SC secretary to provide expertise in the preparation of change requests or items for evaluation or validation Validation Team –A permanent, “executive”, group of individuals appointed by and acting as delegates on behalf of their National Bodies Seems to meet SC4 needs –Single Maintenance Team –Multiple sector-specific Validation Teams PCA Staff PCA SIG

6 Date: 21.08.2014, Page 6 The PCA SIG’s

7 Date: 21.08.2014, Page 7 Staff SIG Subsea Equipment Board of Directors General Manager Technical Advisory Board (TAB) SIG Drilling & Completion SIG Reservoir & Production SIG Development & Modification SIG Operation & Maintenance SIG Health, Safety & Environment *)*) * ) SIG – Special Interest Group Technical Advisory Board and SIG’s O&G Production Facilities & Process Plants

8 Date: 21.08.2014, Page 8 Proposed Initial SIG’s l Basic RDL l Electrical l Instrumentation l Rotating Equipment l Static Equipment l Heat Transfer l Piping & Valves Properties should be dealt with within the respective SIG’s Activities the same way. Will probably not be top priority.

9 Date: 21.08.2014, Page 9 SC4 Normal process for the maintenance of existing standards as databases WIP

10 Date: 21.08.2014, Page 10 PCA Process for the Development of PCA RDL and submissions of propsals to ISO Proposal to SC4 RDDB or PCA approved PCA will develop a set of procedures to mirror this process and corresponding status codes

11 Date: 21.08.2014, Page 11 1 2 3 A B C

12 Date: 21.08.2014, Page 12 Consequences l PCA RDS/WIP is the tool for both PCA RDL and SC4 RDDB vThe PCA RDL will in principle cover the whole triangle vOnly the ‘Core’ RDL level is within the scope of the SC4 RDDB under the current regime vMay be extended to cover the ‘Standard’ level? Must be covered! vObjects may be accepted in the PCA RDL, but be rejected by or be out of scope for the SC4 RDDB vReferences to external names and identifiers are expected to be a central part of the PCA RDL (Ref. AEX, BIM etc.) vOutside scope for the SC4 RDDB vWe will therefore have to have separate regimes, incl. status codes for the PCA RDL and the SC4 RDDB l Levels of procedures vSC4 will prepare procedures and status codes based on the ISO/IEC Directives, ISO Supplement Annex ST, Procedure for the development and maintenance of standards in database format (STD_DBs N52 (Rev.1)) vThe PCA Procedure and Status codes will mirror the SC4 Procedures vLevels of Procedures: ISO/IEC-> ISO SC4 -> PCA.

13 Date: 21.08.2014, Page 13

14 Date: 21.08.2014, Page 14 ISO 15926 l ISO 15926 Integration of life-cycle data for process plants including oil and gas production facilities vISO 15926 - 1 Overview and fundamental principles (Approved IS) vISO 15926 - 2 Data model (Approved IS) vISO 15926 - 3 Geometry. (Approved TS) vISO 15926 - 4 Initial reference data. (Approved TS) (Included in the RDS) vISO 15926 - 5 Procedures for registration and maintenance of reference data (NWI/CD pending resolution on MA) vISO 15926 - 6 Scope and methodology for developing additional reference data (NWI/CD to be submitted to ISO Q3 2007) vISO 15926 - 7 Implementation methods for the integration of distributed systems (TS submitted to ISO Q3 2007)