2 nd Intermediate Meeting Portorose (SLO) 14 -15/03/2013 WP 3 - Pilot Project Presentation Municipality of Cervia – PP1 Javni razpis št. 02/2009: SALTWORKS.

Similar presentations


Presentation on theme: "2 nd Intermediate Meeting Portorose (SLO) 14 -15/03/2013 WP 3 - Pilot Project Presentation Municipality of Cervia – PP1 Javni razpis št. 02/2009: SALTWORKS."— Presentation transcript:

1 2 nd Intermediate Meeting Portorose (SLO) 14 -15/03/2013 WP 3 - Pilot Project Presentation Municipality of Cervia – PP1 Javni razpis št. 02/2009: SALTWORKS - Ekolosko trajnostno vrednotenje solin med Italijo in Slovenijo Bando pubblico n. 02/2009: SALTWORKS - Valorizzazione ecosostenibile delle saline tra Italia e Slovenia

2 Cervia, Pilot Project – External renovation In Cervia Saltpans, the pilot project had as purpose the restoration and the internal preparation of the ancient Hexagonal Aqueduct Tower to be used as a starting point for a cultural itinerary in the Saltpans. The Tower, not used in the last years, has a good location near the Saltpans’ Visitor Center. Thanks to the up-coming inside multimedia equipment, it will be possible to introduce new historical and scientific contents increasing the cultural and didactical Saltpan offert. 2nd Intermediate Meeting Portorose 14-15/03/2013 WP3 Pilot Project presentation

3 Cervia, Pilot Project – External renovation The Cervia’s Pilot Project has been recently changed because the planned Mooring Area, has not been authorized by State Forester Corps. Therefore the Municipality has decided to redevelop the outstanding Tower area that aims at reclaiming it from pollutant materials too (as “eternit”). 2nd Intermediate Meeting Portorose 14-15/03/2013 WP3 Pilot Project presentation

4 Cervia, Pilot Project Location New town Old town 2nd Intermediate Meeting Portorose 14-15/03/2013 WP3 Pilot Project presentation

5 WP 3 Work Team RefereeProject Role Venturi Gianna – Responsabile del Servizio Attività economiche e del Servizio Parco della salina Team Manager Gasperoni Roberta Management and project reporting Di Martino Elisabetta – Responsabile Ufficio Europa Administrative activities and reporting management Bottari Stefano – Servizio Progettazione Management of the Pilot Action (wp3) 2nd Intermediate Meeting Portorose 14-15/03/2013 WP3 Pilot Project presentation

6 Pilot Project actions – External renovation The Restoration of the hexagonal Aqueduct Tower The Design of a multimedia information point for the discovery of Cervia’ s Old Town 2nd Intermediate Meeting Portorose 14-15/03/2013 WP3 Pilot Project presentation

7 Pilot Project actions – External renovation Renovate the walls Cornices and string courses consolidation, tank cover waterproofing New flooring New outside pavement area Environmental redevelopment of a new external area 2nd Intermediate Meeting Portorose 14-15/03/2013 WP3 Pilot Project presentation

8 Pilot Project actions– Internal preparation Interior design: Interactive floor, multimedia panels; Virtual map tours, that illustrate the Cervia’s territory evolution ( 6 languages) 2nd Intermediate Meeting Portorose 14-15/03/2013 WP3 Pilot Project presentation

9 Cervia, Pilot Project: Phases & State of the art Feasibility study – approved on 24.04.2012 On 29.05.2012 Approval of the preliminary draft and the beginning of the final phase design On 30.08.2012 Final draft has obtains a positive opinion from the Private Building Service On 04.09.2012 positive opinion from the Quality Architectural and Landscape Commission 2nd Intermediate Meeting Portorose 14-15/03/2013 WP3 Pilot Project presentation

10 Cervia, Pilot Project: Phases & State of the art On 24.09.2012 the State Property Agency, gave a positive opinion to preliminary draft On 28.09.2012, the Architectural Heritage and Cultural Activities Authority, authorized the implementation of the project 2nd Intermediate Meeting Portorose 14-15/03/2013 WP3 Pilot Project presentation

11 Cervia, Pilot Project: Phases & State of the art On 24.09.2012 The State Forester Corps, Territorial Office of Biodiversity, gave: - a positive opinion on the Tower project to recover the surrounding areas; - a negative opinion for a new docking point for boats to ensure an environmental and wildlife protection. 2nd Intermediate Meeting Portorose 14-15/03/2013 WP3 Pilot Project presentation

12 Cervia, Pilot Project: Phases & State of the art Following the denied opinion, it was decided to proceed with a new project that includes the Tower surrounding area: - Demolition of the building nearby the Tower that looks dilapidated and build with poor materials - Remove the asbestos- cement cover; - The renovation of the area 2nd Intermediate Meeting Portorose 14-15/03/2013 WP3 Pilot Project presentation

13 Cervia, Pilot Project: State of the art The final design was approved the last 18 December. Currently the work team is concluding the final design. The work completion is expected to the end of October 2nd Intermediate Meeting Portorose 14-15/03/2013 WP3 Pilot Project presentation

14 Grazie per l’attenzione! Hvala za vašo pozornost! Roberta Gasperoni gasperonir@comunecervia.it Progetto finanziato nell'ambito del Programma per la Cooperazione Transfrontaliera Italia-Slovenia 2007-2013, dal Fondo europeo di sviluppo regionale e dai fondi nazionali Projekt sofinanciran v okviru Programa čezmejnega sodelovanja Slovenija-Italija 2007-2013 iz sredstev Evropskega sklada za regionalni razvoj in nacionalnih sredstev Ministero dell'Economia e delle Finanze