East Area Renovation Project COST AND SCHEDULE REVIEW 3 EA equipment readiness
G. Romagnoli, E. Montbarbon
2
EA Equipment readiness
Linear planning for each equipment, 13/12/2019 CSR#3 - Follow-up meeting
3
EA Equipment readiness
Linear planning for each equipment: critical points, milestones and asociated risks have been identified Date Risk of failed delivery Shielding Ground admissible loads validation 20 Dec 2019 HIGH – big impact on other services Beatch files (only secondary lines final Xcheck) Integration model frozen for secondary lines HIGH – other deliverables influenced Magnet supports Technical drawings secondary lines High – fabrication and installation delays Vacuum system End Jan, 2020 NORMAL- fabrication delays Collimators Assembly collimator 4-blocks Feb. 2020 LOW XCET Specification and procedure approval HSE End Jan. 2020 LOW Test and assembly planning delays Gas supply system Validation prototype and order components Delay on planning influencing also XCET Control Rooms / Nothing critical 13/12/2019 CSR#3 - Follow-up meeting
4
Status of the BEATCH files
Beam line Status Work to be done F6D Add the vacuum elements in the BEATCH file Note: Beam optics not affected F61 F62 F63 T08 T09 In progress Check the exact location of the 2 first collimators (XCHV011 and XCHV014) because of the M200 dipole of T10 (MBXHF017) T10 Define the radial displacement of the 1st M200 dipole (MBXHF017) T11 Define the radial displacement of the 1st M200 dipole (MBXHF010) Cross-check the optics because of 2 quadrupoles displacements 13/12/2019 CSR#3 - Follow-up meeting
5