Presentation is loading. Please wait.

Presentation is loading. Please wait.

RPN / RISK PRIORITY NUMBER

Similar presentations


Presentation on theme: "RPN / RISK PRIORITY NUMBER"— Presentation transcript:

1 RPN / RISK PRIORITY NUMBER
Analysis Of Risk RPN / RISK PRIORITY NUMBER What Is Risk? Probability of danger Severity/Occurrence/Cause

2 WHICH ONE IS WORSE? Evaluation by RPN Only Case 1 Case 2 Case 3 Case 4
S=5, O=5, D=2 RPN = 50 Case 2 S=3, O=3, D=6 RPN = 54 Case 3 S=2, O=10, D=10 RPN = 200 Case 4 S=9, O=2, D=3 RPN = 54 WHICH ONE IS WORSE?

3 Example Extreme Safety/Regulatory Risk = 9 & 10 Severity
High Risk to Customer Satisfaction Severity ≥ 5 and Occurrence ≥ 4 Consider Detection only as a measure of Test Capability.

4 Example of Significant/ Critical Threshold

5 2) Potentially Significant
Evaluation by RPN Only Case 1 S=5, O=5, D=2 RPN = 50 Case 2 S=3, O=3, D=6 RPN = 54 Case 3 S=2, O=10, D=10 RPN = 200 Case 4 S=9, O=2, D=3 RPN = 54 2) Potentially Significant 4) Low Risk WHICH ONE IS WORSE? 3) Potential Annoyance 1) Potentially Critical

6 Re-rating RPN After Actions Have Occurred
Severity typically stays the same. Occurrence is the primary item to reduce / focus on. Detection is reduced only as a last resort. Do not plan to REDUCE RPN with detection actions!!! 100% inspection is only 80% effective! Reducing RPN with detection does not eliminate failure mode, or reduce probability of causes Detection of 10 is not bad if occurrence is 1

7 RPNinitial - RPNrevised % Reduction in RPN = RPNinitial
Good Use of RPN’s Effectiveness of Recommended Action(s) Report percentage reduction in RPN as Cause Risk Reduction. RPNinitial - RPNrevised % Reduction in RPN = RPNinitial