Presentation is loading. Please wait.

Presentation is loading. Please wait.

New Exploration Gas Prospect

Similar presentations


Presentation on theme: "New Exploration Gas Prospect"— Presentation transcript:

1 New Exploration Gas Prospect
Simulation Study Investigating: Well arrangements to recover hydrocarbons Production profiles and recovery factors Sensitivity to rock compressibility Sensitivity to target deliverability rate Sensitivity to tubing size – 3.5 versus 4.5

2 New Exploration Gas Prospect
Top of Structure – Sand A

3 Eugene Island -Thunderbolt Prospect
Top of Structure - Sand B

4 New Exploration Gas Prospect
Top of Structure - Sand C

5 New Exploration Gas Prospect
Sand A BCF

6 New Exploration Gas Prospect
Gas Zone - Sand B, 938 BCF

7 New Exploration Gas Prospect
Gas Zone - Sand C, 642 BCF

8 Completion Strategy Objectives:
Maintain deliverability targets – 300 / 715 mmcf/d cases Produce all fault blocks efficiently Complete largest targets first Only plugback completions Resulting Completion Strategy: 11 wells required 2 wells in Sand A 6 wells in Sand B 3 wells in Sand C 6 wells required at time 0 for 300 mmcf/d case 2 recompletions – A and E both from to ft.

9 Well Completions in Sand A
715 mmcf/d, 4.5 tbg, Cr =15E-6 Well I BCF Well K – 105 BCF

10 Well Completions in Sand B Well E – 29 BCF, recompletion
715 mmcf/d, 4.5 tbg, Cr =15E-6 Well E – 29 BCF, recompletion Well H – 150 BCF Well F – 189 BCF Well J – 174 BCF Well B – 123 BCF Well C – 56 BCF Well D – 34 BCF

11 Well Completions in Sand C
715 mmcf/d, 4.5 tbg, Cr =15E-6 Well E – 86 BCF Well G – 185BCF Well A – 178 BCF

12 Comparison – low vs. high Crock
715 mmcf/d, 3.5 tbg, Cr =15E-6 and 5E-6

13 Comparison – 3.5 vs 4.5 tbg 715 mmcf/d, Cr = 5E-6

14 Conclusions Recoveries between 45-52 % possible
Low recoveries for high Crock, 3/1 Aquifer 11 wells for 715 mmcf/d 6 wells followed by 5 drilled wells for 300 mmcf/d 4.5 tubing increases gas recovery for 715 mmcf/d 50 BCF additional reserves vs. 3.5 tubing Tubing size does not increase ultimate recovery or deliverability significantly for 300 mmcf/d case


Download ppt "New Exploration Gas Prospect"

Similar presentations


Ads by Google