Presentation is loading. Please wait.

Presentation is loading. Please wait.

Proj. #2: Measuring CME speed

Similar presentations


Presentation on theme: "Proj. #2: Measuring CME speed"— Presentation transcript:

1 Proj. #2: Measuring CME speed
CSI /PHYS Solar Atmosphere Fall 2004 Proj. #2: Measuring CME speed

2 LASCO C1/C2/C3 Coronagraphs
C1: 1.1 – 3.0 Rs (1996 to 1998, then died) C2: 2.0 – 6.0 Rs (1996 up to today) C3: 4.0 – 30.0 Rs (1996 up to today) C C C3

3 LASCO C2 Movie C2: 2.0 – 6.0 Rs

4 LASCO C2 Running-Difference Image

5 LASCO C2 Running-Difference Image (cont’d)

6 LASCO C3 Running-Difference Image

7 LASCO C3 Running-Difference Image (cont’d)


Download ppt "Proj. #2: Measuring CME speed"

Similar presentations


Ads by Google