1 Status of the treatments and deliveries
Sylviane Chaintreuil

2 Status and planning LRc07 20 06/04/2011 28/06/2011 84 82
Run code Run nb Begins (data) Ends (data) Duration seismo data Duration exo data Released LRc07 20 06/04/2011 28/06/2011 84 82 S : 04/04/2012 E : 17/01/2012 SRc03 21 01/07/2011 05/07/2011 5 Planned 22/05/12 Planned 10/05/12 LRc08 22 06/07/2011 30/09/2011 88 86 E : 13/03/2012 SRa04 23 28/11/2011 56 53 Planned 03/05/12 SRa05 24 29/11/2011 09/01/2012 41 39 E : 24/02/2012 LRa06 25 10/01/2012 29/03/2012 80 78 LRc09 28 10/04/2012 S.Ch. - CoRoT SC /04/2012

3 Re-processing in progress
Line of sight and light curves are re-produced Some runs were asked for : LRa03, LRa04, LRa05, LRc03 Other runs will follow S.Ch. - CoRoT SC /04/2012

4 Re-observations Stars must be well identified before the observation
It is not possible to change the CorotID when the observation has begun The instrument was not designed to have absolute measurements It is very difficult to compare absolute intensities between two observations S.Ch. - CoRoT SC /04/2012