CONSTRUCTION BUSINESS IN NIGERIA
THE EVENT TO GROW YOUR CONSTRUCTION BUSINESS IN NIGERIA Welcome to the CPD certified programme September 2019
2
Presentation Title HAS YOUR BADGE BEEN SCANNED?
Attendance certificates are available only to attendees who have been scanned within the first 30 minutes of this session. Head over to the scanner at the entrance of this workshop theatre if your badge was not scanned. Certificates will be available for collection in two hours and can be collected at the cpd certificate collection point. Speak to a member of the staff for more information
3
Presentation Title SPEAKERS: TOPIC: TIME: OLAIYA OLUWAFEMI MUYIDEEM
SURVEYOR AT SINOHYDRO CORPORATION TOPIC: INVESTMENT IN INFRASTRUCTURAL DEVELOPMENT AND EQUAL INVESTMENT INTO FUTURE GENERATIONS+ INFRASTRUCTURE FOR BRIGHT ECONOMY. KNOW THE RIGHT SURVEYOR FOR YOUR ORGANIZATION. SAVE COST, IMPROVE EFFICIENCY THROUGH AVOIDING REWORK TIME: 12:30 – 13:00
4
THIS PRESENTATION FOCUS ON THE FOLLOWING
Audience's concerns on investment in infrastructural development projects in Nigeria will be addressed through unfolding the opportunity and benefits Nigerian market possess. Audience will have a perfect understanding of different expertise of Surveyors needed for infrastructural development projects in Nigeria. Audience will understand the perfect technique to avoid rework, save cost and increase productivity in respect to construction projects in Nigeria.
5
CHAPTER ONE: BUSINESSES NEED VAST INVESTMENT FOR NEW INFRASTRUCTURE TO SPUR ECONOMIC GROWTH
6
NIGERIA AS AN ARENA FOR INVESTMENT IN CRITICAL BUILDINGS AND CIVIL CONSTRUCTION PROJECTS SUCH AS:
7
Housing Infrastructural Project
8
Road Infrastructural Project
9
Railway Infrastructural Project
10
Electricity Power Infrastructural Project
11
NIGERIAN HOUSING DEFICIT AND ITS MARKET OPPORTUNITY: WE NEED TO START BUILDING
12
NIGERIAN GOVERNMENT CLEARLY OPEN DOORS FOR PUBLIC PRIVATE PARTNERSHIPS IN ORDER TO BRIDGE THE HOUSING DEFICIT IN NIGERIA
13
NIGERIAN ROAD INFRASTRUCTURE: A CRITICAL COMPONENT FOR ECONOMIC AND DEVELOPMENT GROWTH
14
30,000 Km were Paved Road
15
25,000 Km were Gravel Road
16
53,000 Km were Unimproved Earth.
17
75 percent of the 30,000 Km that were Paved Road are in Disrepair
18
SOCIO-ECONOMIC BENEFITS
19
TOLL GATES SYSTEM AND ITS ECONOMIC BENEFIT: A STRATEGIC PLAN FOR GOVERNMENT AND PUBLIC PRIVATE PARTNERSHIPS.
20
FIXING NIGERIAN ELECTRICITY POWER SUPPLY SHORTAGE: A FORTUNE INVESTMENT
21
BRIDGING THE ELECTRICITY POWER SUPPLY SHORTAGE IN NIGERIA
22
Wind Power Energy is an option for investment in Nigeria Electricity Power sector.
23
Solar Power Energy is an option for investment in Nigeria Electricity Power sector.
24
Gas-Fired Power Energy is an option for investment in Nigeria Electricity Power sector.
25
Battery Storage Energy is an option for investment in Nigeria Electricity Power sector
26
Hydroelectric Power Energy is an option for investment in Nigeria Electricity Power sector.
27
CHAPTER TWO: WHAT TYPE OF SURVEYING SERVICES DO YOU NEED?
28
TYPES OF SURVEYING SERVICES ARE:
29
Cadastral Surveying
30
Civil Engineering Surveying
31
Hydrographic/Offshore Surveying
32
Mining Surveying.
33
REAL ESTATE CONSTRUCTION PROJECT
34
PARCEL/LAND REGISTRATION
35
WHAT DOES THE CONSTITUTION SAYS?
36
SOCIO-ECONOMIC BENEFITS OF PARCEL/LAND REGISTRATION
37
BUILDING AND CIVIL CONSTRUCTION PROJECTS SUCH AS:
Housing Construction Project Road Construction Project Railway Project Electricity Power Project Seaport Construction Project Airport Construction Project Water Utility Project Electrical and Mechanical Equipment Installation Project Other Large and Complex Construction Project.
38
A client is to seek the service of specialize Civil Engineering Surveyor if he or she needs the following services: When the Construction Project Design Team is missing out on Civil Engineering Surveyors When Control Establishment and Extension around the Project site are required. When Setting out, Positioning Fixing and Measurement in accordance with the construction design specifications, requirements and regulations are necessarily needed. When As-Built Survey of the Construction Project is required. When Project Management Team needs to ensure that construction project is being managed accordingly to budgets and mapping out works progression When the Installation of Large and Complex Electrical and Mechanical Equipment in accordance with design specifications and requirements are required. When Monitoring and Maintenance of Large and Complex Civil Engineering Infrastructures are required.
39
MARINE GEOTECHNICAL AND OCEANOGRAPHY PROJECTS SUCH AS:
Offshore Project Harbor Construction Project Sea Port Construction Project Dredging Project Ocean Mapping Project
40
A client is to seek the service of specialize Hydrography/Offshore Surveyor if he or she needs the following services: When the measurements under the surface of the sea, harbors and rivers and on the adjacent shores are to be determined. When the charts of waterways are to be produced. Before and after dredging activities. When Positioning of Offshore Platforms are required When Long Baseline (LBL) or Short Baseline (SBL) are required for marine projects When the shape and configuration of the seabed or riverbed are to be defined. When the need to determine the depths of water bodies are necessary. When the need to carried out periodical measurements in rise and fall of water bodies.
41
PLANNING AND CONSTRUCTION OF MINING OPERATIONS SUCH AS:
42
Open or Cut Underground Mining
43
Coal Mining
44
Metalliferous Mining
45
Mineral Sands Mining
46
Stones Quarry Mining
47
A client is as well to seek the service of specialize Mining Surveyor if he or she needs the following services: When Setting out Drilling Patterns for the mining operation is required When Control Establishment and Extension around the Mining Areas are needed. When Positioning Fixing and Setting out of Conveyors are necessarily needed When Positioning Fixing and Setting out of Excavation Areas are to be determined. When Location of Mines Underground Roadways are to be determined When Monitoring of Underground Mines Movement is to be determined When Volumes of Materials around and within the Mines areas are to be measured When As-Built Information of the Mines areas are to be modeled and mapped
48
CHAPTER THREE: SAVE COST, IMPROVE EFFICIENCY AND QUALITY STANDARDS THROUGH AVOIDING REWORK ON CONSTRUCTION PROJECTS
49
THE CONSTRUCTION BILLION DOLLARS PROBLEM
50
Construction Material Cost
51
Construction Labor Hours
52
Construction Schedule
53
Construction Quality and Design Standards
54
THE QUESTION IS HOW DO WE REDUCE OR AVOID REWORK TO IMPROVE EFFICIENCY, PRODUCTIVITY AND SAVE COST?
55
FOCUS ON SITE ON DESIGN DELIVERING SPECIFICATIONS AND STANDARDS THROUGH SURVEYING TECHNIQUE KNOWN AS AS-BUILT SURVEYING
56
WHAT IS AS-BUILT SURVEYING?
57
Presentation Title Presentation Title TOPIC TEXT
58
THANK YOU! IF YOUR BADGE WAS SCANNED IN THE FIRST 30 MINUTES OF THE SESSION, YOUR CERTIFICATE WILL BE READY AT THE CPD COLLECTION POINT IN TWO HOURS TIME