Presentation is loading. Please wait.

Presentation is loading. Please wait.

Muhlenberg Township PRP Presentation

Similar presentations


Presentation on theme: "Muhlenberg Township PRP Presentation"— Presentation transcript:

1 Muhlenberg Township PRP Presentation
Jim Bobeck August 21, 2017

2 Pollution Reduction Plan
A pollution “diet” for streams that the state requires municipalities to develop themselves Integrated Water Quality Monitoring and Assessment Report MS4 Requirements Table Impairments, but only some requiring action at this time

3 PRP Requires reduction of pollution for certain criteria
10% reduction in sedimentation Existing and proposed structural BMP’s Laurel Run Creek Impaired with Sedimentation 1,026,846 lbs. 102,685 lbs. 51 tons 2.33 tri axle dump truck loads

4 BMP’s Structural Hydrodynamic Separator Streambank Restoration
Tree Planting

5 BMP’s Non Structural

6 Credit for BMP’s Structural BMP’s: Non Structural
Filtering Practices 80% Stream bank restoration offers ponds per foot per year Tree planting 20% NO BMP offers 100% efficacy Non Structural Street Sweeping 9% Storm Drain Cleaning value is dependent on material collected

7 Questions?


Download ppt "Muhlenberg Township PRP Presentation"

Similar presentations


Ads by Google