Presentation is loading. Please wait.

Presentation is loading. Please wait.

Update on the SPS Impedance Model

Similar presentations


Presentation on theme: "Update on the SPS Impedance Model"— Presentation transcript:

1 Update on the SPS Impedance Model
FS – SPS Sector Valves Pumping Ports in LSS TIDVG #3 and 4 VVSF

2 Sector Valves in the SPS
FS ready for circulation: 2nd iteration after inputs from TE/VSC 02/02/2017; LIU-SPS Beam Dynamics Working Group Meeting Thomas Kaltenbacher; Christine Vollinger

3 TIDVG #3 & 4 - Geometry TIDVG #3 TIDVG #4
Simulation results were reported at the IWG meeting #6 on 30/01/2016 Recap of most important points New information: VVSB next to TIDVG could be exchanged with shielded valve during #5 intervention (high radiation area!). TIDVG #3 TIDVG #4 02/02/2017; LIU-SPS Beam Dynamics Working Group Meeting Thomas Kaltenbacher; Christine Vollinger

4 TIDVG #3 & 4 –Simulation Results
f [GHz] Zs [Ω] Q0 [-] R/Q [Ω] 0.682 1728 21.9 0.784 8200.9 1611 5.1 0.930 1758 6.0 TIDVG #3 f [GHz] Zs [Ω] Q0 [-] R/Q [Ω] 0.904 1017 24.3 0.978 8278.3 1093 7.6 Im(Z)/n = 14.6 mΩ Im(Z)/n = 10.3 mΩ 02/02/2017; LIU-SPS Beam Dynamics Working Group Meeting Thomas Kaltenbacher; Christine Vollinger

5 TIDVG #3 & 4 - Conclusion wires DN70 hole shield
Both, TIDVG #3 and 4 show resonant modes which should be avoided by an improved (impedance-aware) design for TIDVG #5. RF experts are going to be involved from the early design on. TIDVG #4: IWG is involved in the shielding of the up-stream temperature sensor wires. wires DN70 hole shield Courtesy A. Perillo-Marcone 02/02/2017; LIU-SPS Beam Dynamics Working Group Meeting Thomas Kaltenbacher; Christine Vollinger

6 Simulation Results - MBB/DN159
There are currently 11 MBB/DN159 pumping ports in the tunnel. f [GHz] Zs [Ω] Q0 [-] R/Q [Ω] 1.417 3200 3.6 1.496 2071.9 178 11.6 10 conv. bellows MBB DN159 bp DN70 pp Note: Presented values are per element. 02/02/2017; LIU-SPS Beam Dynamics Working Group Meeting Thomas Kaltenbacher; Christine Vollinger

7 VECM & VVSF – DN400 Gate Valve
There are 2 items in the SPS (pos and 61880) Simplified geometry  further refinement ongoing Ø 273 Ø 350 Ø 400 Ø 130 02/02/2017; LIU-SPS Beam Dynamics Working Group Meeting Thomas Kaltenbacher; Christine Vollinger

8 VECM & VVSF – Prelim. Results
WAK Eigenmode simulation: f [GHz] Zs [Ω] Q0 [-] R/Q [Ω] 0.608 8961 3.3 0.664 9914 1.7 0.727 8747 2.0 Q-values are overestimated due to boundaries. Next step: Detailed VVSF model will be inserted. etc. 02/02/2017; LIU-SPS Beam Dynamics Working Group Meeting Thomas Kaltenbacher; Christine Vollinger

9 Conclusions Ongoing discussions with VSC and simulations concerning cross-sectional changes. Further investigation of unshielded pumping ports 02/02/2017; LIU-SPS Beam Dynamics Working Group Meeting Thomas Kaltenbacher; Christine Vollinger

10 Further Objects Selected for Evaluation I/II
SSS #51 in Sextant 2 253 45 MDHA PBCE VVSB MBA DN273 with bellows unsh. pp DN273 DN273 with bellows eccentric DN159 Thanks for valuable inputs to J. A. Ferreira Somoza! 02/02/2017; LIU-SPS Beam Dynamics Working Group Meeting Thomas Kaltenbacher; Christine Vollinger

11 Injection from TT10 at pos. 11855 in LSS1
Further Objects Selected for Evaluation II/II Injection from TT10 at pos in LSS1 Ø 356 with bellows circulating beam injected beam 02/02/2017; LIU-SPS Beam Dynamics Working Group Meeting Thomas Kaltenbacher; Christine Vollinger


Download ppt "Update on the SPS Impedance Model"

Similar presentations


Ads by Google