1 Alexander Herlert, CERN (PH-SME-IS)
ISOLDE scientific coordinator’s report INTC meeting, June 23, 2010 Alexander Herlert, CERN (PH-SME-IS) Beam requests 2010 ISOLDE Schedule 2010 Start of running period 2010

2 New and active experiments at ISOLDE
INTC February 2010 5 new experiments: IS499 – IS503 132 approved RIB shifts (out of 183 requested) 8 experiments completed (3 REX experiments): IS381, IS414, IS415, IS417, IS418, IS425, IS431, IS469  69 active experiments for 2010 beam period

3 Injector schedule 2010 (V1.7) ISOLDE dates: protons from PSB May 3
physics start ISOLDE May 6 protons stop November 22 (i.e. ~29 weeks for physics as compared to 31 weeks in 2009) Several long periods of MD partly with parasitic beam to ISOLDE (not guaranteed) Technical stops keep changing dates …

4 ISOLDE beam requests 2010 Beam requests:
627.5 RIB shifts requested by 50 experiments (17 with no request) For comparison to 551 RIB shifts requested in 2008 and 627 in 2009 Requested RILIS shifts: 350  >50% (337 in 2008 and 359 in 2009) Requested REX-ISOLDE RIB shifts: 333 (273 in 2009) Additional ~40 shifts for TISD, LOIs + off-line MD … Scheduled runs (present status): 469 RIB shifts in total (609 shifts for running period incl. PSB setup) 432 RIB shifts for 41 experiments 74 different beams 19 beams and 36 experiments not scheduled (17 of those with no request and/or completed) 7 REX-ISOLDE runs for 11 experiments with ~160 RIB shifts (~37%) 4

5 ISOLDE schedule 2010 - overview
ISOLDE program 2010 (Version 1.2): physics started May 6 protons stop Nov. 22 ~29 weeks for physics So far scheduled: 41 IS experiments 3 TISD runs 6 LOIs >460 RIB shifts >70 different beams GPS HRS

6 ISOLDE schedule 2010 – REX-ISOLDE
25 active REX experiments 17 requested beam 11 scheduled 3+3 share target/setup (but different beams) 7 runs 3 days for setup + LOI (TF polarization) + 2 WITCH on-line runs Need REX-TRAP Operation of WITCH still not compatible with EBIS/ LINAC operation

7 ISOLDE schedule 2010 – Targets
28 target units planned 12 for HRS 16 for GPS Some old or to be reused during period 10 new UCx units (1 HD) TISD 3 dedicated runs: - Molten metal target plus VADIS - low work-function cavity + Sm RILIS - High density UCx

8 ISOLDE schedule 2010 – RILIS
14 RILIS runs planned No off-line run 1 target test (Sm) dense schedule At scheme to be tested >210 RIB shifts planned >2000h operation

9 First on-line runs in 2010 TISD: Sm RILIS target test (with low work-function cavity) at GPS: No Sm beam observed – not successful SSP collections with YO HP target (GPS): Strong stable contamination present Not much physics output Good tests with promising yields of Fe and Cr beams SiC target with Mg RILIS (GPS): Despite some vacuum problems and contaminants good results for SSP Successful run for COLLAPS experiment (n-def Mg isotopes) ZrO target with RILIS for Cu (HRS): Successful run for COLLAPS experiment (n-def Cu isotopes) Good results for SSP despite RFQ problems YO CP target for 1st REX-ISOLDE run (GPS): 9C yield dropped quickly after start - not successful – need target test ZrO target with RILIS for Ga (HRS): Target broken right before on-line run - cancelled

10 New procedure for proposals
Safety file for all experiments required all new INTC proposals need to provide a ‘safety file’ with the submission of the proposal (or addendum) Safety aspects will be discussed with CERN specialists before the INTC meeting Approval from Research Board only with endorsed safety file  More details soon …

11 … finally This is my last INTC meeting as ISOLDE Physics Coordinator…
…Thanks a lot to all colleagues in the local ISOLDE Physics group, in the ISOLDE ‘technical’ groups, and in the INTC, and of course thanks a lot to all the ISOLDE Users for their cooperation and support in the last years.

12 … and last but not least Please welcome the next
ISOLDE Physics coordinator Magdalena Kowalska at the November INTC meeting!