Presentation is loading. Please wait.

Presentation is loading. Please wait.

Accomplished Recommendation Planned Actions for Control

Similar presentations


Presentation on theme: "Accomplished Recommendation Planned Actions for Control"— Presentation transcript:

1 Accomplished Recommendation Planned Actions for Control
Table 5. Control Plan Communicated for the Company Staff Accomplished Recommendation Planned Actions for Control Frequency Responsibility A contract with a new supplier for steel wire was established -Evaluation for all suppliers -Three months -Purchasing Department Mixing machine replaced by a new one with a more reliable counter. -Predictive and Preventive maintenance as per manuals -Weekly -Maintenance Department Complete maintenance was implemented to the drawing and cutting machine Cleaning process of the work space -Set schedule forcleaning with a checklist and signature -Daily -Production Department Instructions for engineers to avoid having any unpacked products -Ensure that there is no unpacked products Mohamed K. Hassan et al. Applying Lean Six Sigma for Waste Reduction in a Manufacturing Environment. American Journal of Industrial Engineering, 2013, Vol. 1, No. 2, doi: /ajie-1-2-4 © The Author(s) Published by Science and Education Publishing.


Download ppt "Accomplished Recommendation Planned Actions for Control"

Similar presentations


Ads by Google