Presentation is loading. Please wait.

Presentation is loading. Please wait.

Conclusions 1 Building the observing programme

Similar presentations


Presentation on theme: "Conclusions 1 Building the observing programme"— Presentation transcript:

1 Conclusions 1 Building the observing programme
First steps of the core observing programme 2 long runs LRa1 LRc1 NEXT - Choice of the first short run: SRc0 CW9/SC16 - Choice of the short run of the anticentre SRa1 CW9/SC16 - Next long runs: LRa2, LRc2 CW10/SC17 Additional Programmes Answer to the AO: July 5th, Results: September 10th CW8 Short runs

2 Conclusions 2 Combined observations :
- important preparatory programmes have been achieved General plan to ESO and other agencies Group for follow-up of diff. techniques - Choice of the methods for templates definition and warning mode CW8 Short runs

3 Workshops ACROCOROT : November Ubatuba, Brazil
Seismo expl prog: fall ? Model comparison: fall ? Blind test in EXO (color) Results at CW9 Hare and Hounds in sismo: HH4 Procyon HH5 Classical pulsators Results at CW9 CW8 Short runs

4 As usual, the contributions will be posted on the web page
Send them asap at Next CorotWeek CW 9 at ESTEC December 6 to 9 CW8 Short runs


Download ppt "Conclusions 1 Building the observing programme"

Similar presentations


Ads by Google