Presentation is loading. Please wait.

Presentation is loading. Please wait.

REVISED TRID KNOWLEDGE. CLARITY. RELIABILITY.

Similar presentations


Presentation on theme: "REVISED TRID KNOWLEDGE. CLARITY. RELIABILITY."— Presentation transcript:

1 REVISED TRID KNOWLEDGE. CLARITY. RELIABILITY.
(888)

2 Agenda TRID General Loan Estimate Closing Disclosure 2018 Changes
Frequently Asked Questions

3 General TRID RULES

4 Scope Closed-end Consumer Real Estate

5 NoT Exempt Temporary Loans Loans over 25 acres Lot loans
Construction loans Bridge Loans

6 Loan Estimate: Timing

7 Timing: The Closing Disclosure
3 Business Days Receipt Mailbox rule Business days Consummation

8 Timing Friday, June 5: Closing Disclosure is mailed
Tuesday, June 9: Consumer Receives Closing Disclosure Friday, June 12: Consummation

9 Timing Mon: 6/1 Application submitted Tues: 6/2 Loan Estimate Mailed
Fri: 6/5 Loan Estimate received and consumer gives intent to proceed Wed: 6/10 Consumer locks rate Mon: 6/15 Revised Loan Estimate mailed to consumer 6/18 Revised Loan Estimate received by consumer

10 Timing Tues: 6/16 Because of a COC, title insurance increases, but only 6% over amount disclosed – no LE required Fri: 6/19 Pest inspection shows termite damage requiring an additional inspection bringing totaling 5% of originally disclosed Mon: 6/22 Revised Loan estimate mailed because combined change is now over 10%

11 Sat: 6/27 COC increase title fees once again
Timing Friday: 6/26 Closing Disclosure hand delivered to consumer – earliest closing date is 6/29 Sat: 6/27 COC increase title fees once again Tues: 6/30 Closing Disclosure showing updated fees hand delivered, closing can still happen today

12 Timing? June 4: Change of Circumstance
June 5: CD Scheduled to be Mailed June 9: Consumer Receives CD June, 12: Scheduled Closing Date

13 Revised Loan Estimates
Change in Circumstance Fee exceeds tolerance 3 business days Before closing disclosure

14 Changed Circumstances
Extraordinary Event Inaccurate Information New information specific

15 Revised Closing Disclosures
Any change Post-Closing Non-numerical clerical error Tolerance Cure

16 Revised Disclosure: Waiting Period
APR out of tolerance product changes Add a prepayment penalty

17 Tolerance Items 0% 10% Unlimited Originator Charges
Choose off the list or wasn’t on the list Items the borrower can shop for and choose someone not on the list Cannot Shop For Recording Fees Items that aren’t required by the creditor – not a tolerance item at all Transfer Taxes Section B – did not shop + Section E Escrow payments, Insurance premiums, etc., - not tolerance items at all Sections A, B and E Bucket Section C and H Line x Line Items compared as a whole group – 10% items in Section B + Section E

18 Record Retention 2 years 5 years

19 Loan Estimate

20 Loan Estimate: Page 1

21 Purpose Purchase Refinance Construction Home Equity

22 Loan Terms

23 Projected Payments

24 Payment Calculation

25 Payment Calculation: Adjustable Rate Interest Only Example

26 Projected Payments: Balloon Loan

27 Estimated Taxes, Insurance & Assessments

28 Costs at Closing

29 Optional Table for Transactions Without a Seller

30 Loan Costs: Origination Charges

31 Loan Costs: Services You Cannot Shop For

32 Loan Costs: Services You Can Shop For

33 Other Costs .

34 Cash to Close else = $0

35 Adjustable Payment (AP) Table

36 Adjustable Interest Rate (AIR) Table

37 Additional Information

38 Comparisons Must calculate total payments and principal paid off in the first five years First time we see APR Truncate to at most 3 decimals If APR is a whole number, stop at decimal If less than 3 decimals, truncate extra “0s,” for example, an APR of 5.250% should be listed as 5.25% TIP = Total scheduled interest of term of loan divided by loan amount – Includes prepaid interest the consumer will pay.

39 Other Considerations For disclosures of permanent loans issued before construction, include the statement: “You may receive a revised Loan Estimate at any time prior to 60 days before consummation”

40 Confirmation Receipt

41 Closing Disclosure

42 Closing Disclosure

43 Projected Payments & Closing Costs

44 Loan Costs

45 Other Costs

46 Total Closing Costs

47 Calculating Cash to Close

48 Example of Tolerance Cure

49 Borrower’s Transaction

50 on Behalf of Borrower

51 Seller at Closing

52 Due from Seller at Closing

53 Calculation

54 Additional Information About This Loan

55 Escrow Details

56 No-Escrow Details

57 Loan Calculations

58 Additional Disclosures

59 Contact Information

60 Confirmation Receipt

61 Revisions, Revisions, Revisions
October 3, 2015 October 1, 2018 June 1, 2018

62 Changes Overview Compliance Dates Coverage Total of Payment Tolerances
Revised Disclosures and Good Faith Partial Payment Disclosures Escrow Closing Notice Construction Loans Simultaneous Seconds Rounding Calculating Cash to Close Loan Estimate Disclosures Closing Disclosure Disclosures

63 TRID FAQS 1-18 Pgs 31-36


Download ppt "REVISED TRID KNOWLEDGE. CLARITY. RELIABILITY."

Similar presentations


Ads by Google