Presentation is loading. Please wait.

Presentation is loading. Please wait.

RDE Commission Meeting Nov 20th.

Similar presentations


Presentation on theme: "RDE Commission Meeting Nov 20th."— Presentation transcript:

1 RDE Commission Meeting Nov 20th

2 Proposal for development process:
Random Cycle Prerequisite: The boundary conditions should be defined before reflecting about their randomization, to avoid double programming. Proposal for development process: Define step by step the workload Define the workload and discuss the necessary values prior to implementation at each COM-meeting Goal: Implement the defined workload into the RC software until the next meeting Goal: Present the implemented issues to allow feed back from programmers and users

3 Search Algorithm The search algorithm should be designed with following two steps: 1. Creating a possibility for data updates along the WLTP process by suitable import wizard 2. Intelligent search algorithm, where car specific acceleration ability is compared to WLTP data pool and only the vehicle specific short trips, the chosen car can actually perform Results of preliminary examinations: Necessary calculation time step1 with cycles: about 60 minutes Necessary calculation time step2 with cycles: about 30 minutes

4 Search Algorithm 1. Creating a possibility for data updates

5 Search Algorithm 2. Algorithm, where car specific acceleration ability is compared to WLTP data


Download ppt "RDE Commission Meeting Nov 20th."

Similar presentations


Ads by Google