BRP – Pre-bid Meeting Bridge Reconstruction Project 16th December 2015

Similar presentations


Presentation on theme: "BRP – Pre-bid Meeting Bridge Reconstruction Project 16th December 2015"— Presentation transcript:

1 93684- BRP – Pre-bid Meeting Bridge Reconstruction Project 16th December 2015

2 PURPOSE CONVEY PERTINENT PROJECT INFORMATION
ADVISE BIDDERS TO PROVIDE SUBSTANTIALLY RESPONSIVE BIDS CLARIFY ISSUES/CONCERNS AND/QUERIES

3 PROJECT INFORMATION DONOR: USAID/ UNOPS Implementing Agency: UNOPS
Client: MTRB/MoPI Beneficiaries: National and State Govt and Communities Project Objectives: Improve rural livelihood through provision of sustainable roads to agricultural markets

4 Project Bridges: Location Map

5 Project Bridges: Location Map
Kaya, Koni and Kyibu Kaya Zone 36 N E m N m Koni Zone 36 N E m N m Kayibu Zone 36 N E m N m

6 BRIDGE 1: KAYA RIVER BRIDGES: 17.50+23.00+8.00m SPAN (Precast)
Project Bridges BRIDGE 1: KAYA RIVER BRIDGES: m SPAN (Precast)

7 BRIDGE 1 : KAYA RIVER BRIDGES: 17.50+23.00+8.00m SPAN (Precast)
Project Bridges BRIDGE 1 : KAYA RIVER BRIDGES: m SPAN (Precast)

8 BRIDGE 1 : KAYA RIVER BRIDGES: 17.50+23.00+8.00m SPAN (Precast)
Project Bridges BRIDGE 1 : KAYA RIVER BRIDGES: m SPAN (Precast)

9 BRIDGE 1 : KAYA RIVER BRIDGES: 17.50+23.00+8.00m SPAN (Precast)
Project Bridges BRIDGE 1 : KAYA RIVER BRIDGES: m SPAN (Precast)

10 BRIDGE 1 : KAYA RIVER BRIDGES: 17.50+23.00+8.00m SPAN (Precast)
Project Bridges BRIDGE 1 : KAYA RIVER BRIDGES: m SPAN (Precast)

11 BRIDGE 1 : KAYA RIVER BRIDGES: 17.50+23.00+8.00m SPAN (Precast)
Project Bridges BRIDGE 1 : KAYA RIVER BRIDGES: m SPAN (Precast)

12 BRIDGE 1 : KAYA RIVER BRIDGES: 17.50+23.00+8.00m SPAN (Precast)
Project Bridges BRIDGE 1 : KAYA RIVER BRIDGES: m SPAN (Precast)

13 BRIDGE 1 : KAYA RIVER BRIDGES: 17.50+23.00+8.00m SPAN (Precast)
Project Bridges BRIDGE 1 : KAYA RIVER BRIDGES: m SPAN (Precast)

14 BRIDGE 1 : KAYA RIVER BRIDGES: 17.50+23.00+8.00m SPAN (Precast)
Project Bridges BRIDGE 1 : KAYA RIVER BRIDGES: m SPAN (Precast)

15 BRIDGE 1 : KAYA RIVER BRIDGES: 17.50+23.00+8.00m SPAN (Precast)
Project Bridges BRIDGE 1 : KAYA RIVER BRIDGES: m SPAN (Precast)

16 Project Bridges BRIDGE #2: KONI RIVER BRIDGE: 18.74m SPAN (Cast-in-situ RC)

17 Project Bridges BRIDGE #3: KAYIBU RIVER BRIDGE: 18.74m SPAN (Cast-in-situ RC)

18 Mobilization and Site Establishment Construction
PROJECT SCOPE Pre-Construction Mobilization and Site Establishment Construction Demolition and removal of Existing Structures Construction of Substructures, Superstructures Protection Works Earthworks -Approach Road Gravel Wearing Course – Approach Road Road Furniture – Approach Road Cross-Cutting Issues Environment , Health and Safety Post Construction Demobilization Defect Rectification.

19 Accommodation for Engineer’s staff Security (Camp Perimeters)
KEY WAYPOINTS Mobilization Plant and Equipment Key Personnel Camp Establishment Office facilities Accommodation for Engineer’s staff Security (Camp Perimeters) Other facilities Deconstruction of Existing Structures Reconstruction- Kaya, Koni and Kayibu

20 Section I - Bid Particulars Section II - Instruction to Bidders
Content of the ITB Invitation Letter Section I - Bid Particulars Section II - Instruction to Bidders Section III - Evaluation Method & Criteria Bidders are strictly advised to satisfy themselves all the evaluation criteria are met before submitting bids Section IV - Returnable Bid Schedule (Note: make sure that all the returnable are completed and returned) Section V - UNOPS Measured Price Construction Contract

21 Content of the Bid Documents: Published
ITB Returnable Schedules Annexes Annex 1: BOQ Annex 2: Book of Drawings (Part 1 & Part 2) Annex 3: Standard Technical Specification Annex 4: Special Provisions to the Technical Specifications Annex 5: Environmental Management Plan Annex 6: Measured Price Contract GCC Annex 7: Measured Price Contract Schedules

22 Bid Security: 30 days beyond the bid validity (120 days)
KEY BID INSTRUCTIONS Bid Submission: One envelope: Financial & Technical Proposals sealed envelope Submission: Mail or personal delivery by closing date : NO /ELECTRONIC DELIVERY Bid Currency: USD Bid Validity: 90 days Bid Security: 30 days beyond the bid validity (120 days)

23 Bid Returnables : Complete all Bid closing- 11th January, 2016-10:00AM
KEY BID INSTRUCTIONS Bid Security: an amount 5000USD in the form set out in Returnable Bid Schedule 2 Form of Bid Security (Mandatory): Strictly follow the returnable form and the period set Bid Returnables : Complete all Bid closing- 11th January, :00AM Bid opening- 11th January, 2016, 11:30 AM (Public Opening)

24 Bid Returnable Documents
Responsive bids shall contain the following minimum documents: Schedule 1 - Form of Bid Schedule 2 - Form of Bid Security Schedule 3 - Bidder’s Details Schedule 4 - Bill of Quantities-financial offer Schedule 5 - Bidders Preliminary Programme Schedule 6 - Proposed Project Team & Organizational Structure Schedule 7 - Insurances-Confirmation Schedule 8 - Capacity, Experience, Work In Hand And Work Completed Schedule 9 - Implementation/Quality management System Proposals

25 Bid Returnable Documents
Responsive bids shall contain the following minimum documents: Schedule 10 - Health and Safety Management System Schedule 11 - Environmental Management System Schedule 12 - Proposed Sub Contractors and Suppliers Schedule 13 - Proposed Sources of Naturally Occurring Materials Schedule 14 - Outline Statements of Proposed Methods Schedule 15 - Declaration Schedule 16 - Conflicts of Interest Schedule 17 - Dispute Details Schedule 18 - Addenda to ITB

26 Bid Evaluation and Award
Preliminary Examination: - UNOPS may reject or exclude Bids that : do not comply with the ITB requirements, are incomplete, frivolous, contain material deviation or reservation to the terms of contract Evaluation:- Bids will be evaluated according to Section III of the ITB. Evaluation Procedure:- two step procedure 1st Step: Technical compliance A “pass / fail” method based on objective criteria 2nd step: Financial Bids found to be technically compliant will be evaluated on Price and value for money Analyzing all relevant cost Risks and benefits of each bid NOTE: All three bridges will be awarded to the successful bidder

27 Bidder Eligibility-Article 4 -ITB
Bids submitted by bidders in the following category will not be considered for evaluation and award: Suspended or declared ineligible by UNOPS or any UN System, including the World Bank Is on the UN 1267 terrorist list

28 CONTRACT PERIOD: 9 Calendar months DNP-12 Months INSURANCES
KEY CONTRACTUAL DATA CONTRACT PERIOD: 9 Calendar months DNP-12 Months INSURANCES Contractor’s All Risk Insurance Worker’s Compensation Contractor’s Plant and Equipment Insurance Motor Insurance Professional Indemnity Insurance

29 KEY CONTRACTUAL DATA MATERIAL ON-SITE PAYMENT Crushed Aggregate Reinforcement Steel Cement Guard rails Gabion and mattress mesh boxes Geotextile Concrete panels

30 CLARIFICATIONS Responses to requests for clarification – to be posted on UNOPS’ website at under ITB Case No. UNOPS/SSOC/93684/ITB/WORKS/ Any amendments or clarifications will be posted under the “view documents” of the concerned case file on the “Current business opportunities” on and we kindly ask you to check the site before submitting your bid.

31 Questions ?

32