Project status at CNES

2 Mission schedule The satellite is still alive ! Next RdVs SRc01 SRa01
You are there SRc01 SRa01 SRc02 IRa01 LRc01 LRa01 LRc02 J F M A M J J A S O N D J F M A M J J LV LV ? The satellite is still alive ! 271 days in space 217 days in observation mode Next RdVs 1st week of october : uploading of a new set of Exo-templates on CCD 1 About october 15th : Stop LRc01 – Turn SL – Beginning of LRa01 25th Scientific Committee – 24th september 2007

3 N0 distribution from CNES to LESIA
Number of distributed N0 data : FITS files (509.7 Go) Beginning of life calibration : FITS files (4 Go) IRa01 : FITS files (128 Go) SRc01 : FITS files (51 Go) LRC01 : FITS files (311 Go) Reprocessing : FITS files (15 Go) About 5 Go database exports (HK data) 4 Go 57 Go 66 Go 39 Go 54 Go 82 Go 79 Go 82 Go 44 Go 25th Scientific Committee – 24th september 2007

4 ALC Status Less than 10% data lost Technical investigations
Only PLTM2 (Astero imagettes) Lost of tracking during the pass, around 10° elevation Technical investigations Problem of masks (trees) around the station At CNES : AOS at 15° (instead of 10°) since one week. At ALC : Some trees have been sacrified… 25th Scientific Committee – 24th september 2007

5 VGS Status Backup Station (PLTM2)
One pass per week with no acquisition Several technical odd things Since may, about 6 passes never received at CNES Sometimes PLTM1 instead of PLTM2 Technical investigations on going Goal : to be able to use VGS operationaly if needed 25th Scientific Committee – 24th september 2007