Download presentation
Presentation is loading. Please wait.
Published byHinrich Schmidt Modified over 5 years ago
1
ESSnet #2 Implementing Services 13 December 2018 - Luxembourg
SG Meeting ESSnet #2 Implementing Services 13 December Luxembourg
2
Work Packages WP Number WP Title Lead Person-months WP1
Develop and reuse new services ISTAT 490.00 WP2 Define integration and architecture guidelines SCB 90.00 WP3 Build a sandbox and test available services - containerise SSB NORWAY 120.00 WP4 Create and communicate success stories INE - Portugal 116.00 WP5 Communication and Dissemination of Results INSEE Total of 9060 person-months
3
WP1 deliverables Deliverable Title D1.1
List of services to be developed and reused D1.2 Service 1 D1.3 Report on reuse of Service 1 D1.4 Service 2 D1.5 Report on reuse of Service 2 D1.6 Service 3 D1.7 Report on reuse of Service 3 D1.8 Guidelines on best practices
4
WP2 deliverables Deliverable Title D2.1
Software and integration architecture recommendations D2.2 Cookbook on integration & use D2.3 Interactive report/guidance with examples D2.4 Presentation on services and integration methods
5
WP3 deliverables Deliverable Title D3.1
Blueprint for the platform, including technology stack D3.2 Package container for Service 1 D3.3 Package container for Service 2 D3.4 Package container for Service 3 D3.5 Cloud platform implementing the blueprint D3.6 Report on lessons learned
6
WP4 deliverables Deliverable Title D4.1
Communication pakage on how to move to a service based architecture D4.2 Success stories D4.3 Workshop minutes
7
WP5 deliverables Deliverable Title D5.1 Monitoring report 1 D5.2
Intermediary report D5.4 Monitoring report 3 D5.5 Monitoring report 4 D5.6 Final report D5.7 List of presentations and supporting material
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.