P08027: Winter Quarter Schedule Week 1: Submit IRB test request Week 4: Completion of IRB Test GUI Week 6: Begin IRB testing MSD 2: Prototype Construction.

Similar presentations


Presentation on theme: "P08027: Winter Quarter Schedule Week 1: Submit IRB test request Week 4: Completion of IRB Test GUI Week 6: Begin IRB testing MSD 2: Prototype Construction."— Presentation transcript:

1 P08027: Winter Quarter Schedule Week 1: Submit IRB test request Week 4: Completion of IRB Test GUI Week 6: Begin IRB testing MSD 2: Prototype Construction Winter QuarterSpring Quarter 14 6 MSD 2

2 P08027: MSD2 Schedule Week 1: Initial Prototype Construction Week 4: IRB Study Complete Week 5: Initial System Tests complete, Begin System wide testing Documentation Started. Week 6+: Testing and Refinement Finish Documentation Prototype ConstructionTesting 54 Week 3: Individual System tests complete

3 Week 1 Construct Electrode Strap and sleeve prototypes. Week 2 Finish construction and begin testing. MSD II FLOWCHART P08027: TODD B. Week 3 Resume testing of Strap/Sleeve and modify as necessary. Week 4 Resume testing of Strap/Sleeve and modify as necessary. Week 5 Determine which design is better - sleeve or strap Week 6 Build two prototypes of final, customer approved design Week 7 Resume testing of device and modify as necessary. Week 8 Formal Paper/Poster and documentation Week 9 Formal Paper/Poster Week 10 Formal Paper/Poster Week 11 Present project.

4 Week 1 Develop Signal Processing for HW Continue IRB Week 2 Continue to develop Program Finish IRB MSD II FLOWCHART P08027: VIANNA M. Week 3 Implement signal processing in HW Week 4 Continue program. Test functionality With DSP. Week 5 Test Signal Processing program Week 6 Continue to modify signal processing code Begin formal paper and Poster design. Week 7 Continue testing and Analysis. Continue paper and Poster. Week 8 Finish testing, make Appropriate changes. Begin finalizing paper And poster. Week 9 Final troubleshooting And testing. Finish paper and Poster. Week 10 Double Check tasks Assure everything is Completed and functional Week 11 Prepare and demonstrate final product

5 Week 1 Interface amplifier with DSP board. Continue IRB. Week 2 Begin coding on the DSP. Finish IRB. MSD II FLOWCHART P08027: PETER D. Week 3 Continue coding on the DSP.. Week 4 Continue coding on the DSP. Begin Testing with controller algorithm Week 5 Integrating filtering with the Control system Week 6 Starting testing with IRB gathered data Week 7 Continue testing with the IRB data Week 8 Formal Paper/Poster Continued testing Week 9 Formal Paper/Poster Continued testing Week 10 Formal Paper/Poster Continued testing Week 11 Product Presentation

6 Week 1 Continue IRB. Begin communication With the DSP Week 2 Finish the IRB. Work on Control algorithm with On the DSP. MSD II FLOWCHART P08027: JAY R. Week 3 Continue DSP control Algorithm. Week 4 Finish the Control System and begin testing With the filter Week 5 Test Wireless Transmission of data Between DSP and car. Week 6 Test and T/S issues With DSP using Live EMG data Week 7 Test and T/S issues With DSP using Live EMG data Week 8 Test and T/S issues With DSP using Live EMG data. Begin documentation Week 9 T/S, Document Week 10 Document all Implementation on DSP Along with results Week 11 Product Presentation

7 Week 1 Begin implementation of RC subroutines. Continue IRB Study Week 2 Continue implementing RC subroutines. Finish IRB Study MSD II FLOWCHART P08027: JAMES C. Week 3 Begin implementing wireless subroutine Test RC subroutines Week 4 Continue implementing wireless subroutines Week 5 Test wireless communications Week 6 Help with DSP, begin System wide tests Week 7 Help with DSP Continue T/S and modification Week 8 Continue developing and Testing interface Between DSP and car Week 9 Documentation. Finish development of RC Car controls. Week 10 Document Interfaces Week 11 Final testing and documentation authoring

8 Week 1 Inventory Parts Continue IRB Testing Week 2 Put together Speaker Test and Troubleshoot (T/S). Finish IRB Study MSD I FLOWCHART P08027: DANZIGER Week 3 Put together test matrix for DSP output Document for next SD phase Week 4 TroubleShoot RC Car, DSP, Speaker Document for next SD phase Week 5 Continue T/S as needed Document for next SD phase Week 6 Continue T/S as needed. Begin full system tests Begin final paper Documentation Week 7 Troubleshoot, Test Continue Final paper Begin Poster Documentation Week 8 Document System Continue T/S, final paper, Poster design Documentation Week 9 Trouble Shoot System Finish paper Finish poster design Week 10 Present Completely Working System Finish all SD doc. for Next phase Week 11 Present the system Ensure all aspects are complete.