Presentation is loading. Please wait.

Presentation is loading. Please wait.

May 2013 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG SRU Opening Information for May 2013] Date.

Similar presentations


Presentation on theme: "May 2013 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG SRU Opening Information for May 2013] Date."— Presentation transcript:

1 May 2013 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG SRU Opening Information for May 2013] Date Submitted: [14 May, 2013] Source: [Shoichi Kitazawa] Company [ATR] Address [2-2-2, Hikaridai, Seika, Kyoto, Japan] Voice:[ ], FAX: [ ], Re: [] Abstract: [This presentation is opening information for IG SRU meeting] Purpose: [information] Notice: This document has been prepared to assist the IEEE P It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P Shoichi Kitazawa (ATR)

2 IEEE 802.15 IG SRU Opening Information Waikoloa, HI May 14, 2013
Shoichi Kitazawa (ATR)

3 Administrative Items Required notices Chair and Secretary
May 2013 Administrative Items Required notices Affiliation FAQ - Anti-Trust FAQ - Ethics - Chair and Secretary Chair is Shoichi Kitazawa(ATR) Shoichi Kitazawa (ATR)

4 Participants, Patents, and Duty to Inform
May 2013 Participants, Patents, and Duty to Inform All participants in this meeting have certain obligations under the IEEE-SA Patent Policy. Participants [Note: Quoted text excerpted from IEEE-SA Standards Board Bylaws subclause 6.2]: “Shall inform the IEEE (or cause the IEEE to be informed)” of the identity of each “holder of any potential Essential Patent Claims of which they are personally aware” if the claims are owned or controlled by the participant or the entity the participant is from, employed by, or otherwise represents “Personal awareness” means that the participant “is personally aware that the holder may have a potential Essential Patent Claim,” even if the participant is not personally aware of the specific patents or patent claims “Should inform the IEEE (or cause the IEEE to be informed)” of the identity of “any other holders of such potential Essential Patent Claims” (that is, third parties that are not affiliated with the participant, with the participant’s employer, or with anyone else that the participant is from or otherwise represents) The above does not apply if the patent claim is already the subject of an Accepted Letter of Assurance that applies to the proposed standard(s) under consideration by this group Early identification of holders of potential Essential Patent Claims is strongly encouraged No duty to perform a patent search Slide #1 Shoichi Kitazawa (ATR)

5 May 2013 Patent Related Links All participants should be familiar with their obligations under the IEEE-SA Policies & Procedures for standards development. Patent Policy is stated in these sources: IEEE-SA Standards Boards Bylaws IEEE-SA Standards Board Operations Manual Material about the patent policy is available at If you have questions, contact the IEEE-SA Standards Board Patent Committee Administrator at or visit This slide set is available at Slide #2 Shoichi Kitazawa (ATR)

6 Call for Potentially Essential Patents
May 2013 Call for Potentially Essential Patents If anyone in this meeting is personally aware of the holder of any patent claims that are potentially essential to implementation of the proposed standard(s) under consideration by this group and that are not already the subject of an Accepted Letter of Assurance: Either speak up now or Provide the chair of this group with the identity of the holder(s) of any and all such claims as soon as possible or Cause an LOA to be submitted Slide #3 Shoichi Kitazawa (ATR)

7 Other Guidelines for IEEE WG Meetings
May 2013 Other Guidelines for IEEE WG Meetings All IEEE-SA standards meetings shall be conducted in compliance with all applicable laws, including antitrust and competition laws. Don’t discuss the interpretation, validity, or essentiality of patents/patent claims. Don’t discuss specific license rates, terms, or conditions. Relative costs, including licensing costs of essential patent claims, of different technical approaches may be discussed in standards development meetings. Technical considerations remain primary focus Don’t discuss or engage in the fixing of product prices, allocation of customers, or division of sales markets. Don’t discuss the status or substance of ongoing or threatened litigation. Don’t be silent if inappropriate topics are discussed … do formally object. See IEEE-SA Standards Board Operations Manual, clause and “Promoting Competition and Innovation: What You Need to Know about the IEEE Standards Association's Antitrust and Competition Policy” for more details. Slide #4 Shoichi Kitazawa (ATR)

8 IG SRU Sessions The IG SRU meeting is held every plenary meeting.
January 2013 IG SRU Sessions The IG SRU meeting is held every plenary meeting. 1st version of technical document of IG SRU released March 2012 ( ). Year Month Venue Agenda Closing Report Minutes Number of participant 2010 November Dallas 10 2011 March Singapore 8 July San Francisco 11 Atlanta 13 2012 Waikoloa 4 San Diego San Antonio 9 2013 January Vancouver Orlando 12 Shoichi Kitazawa (ATR)

9 Agenda items for the week
April 2013 doc.: IEEE <doc#> May 2013 Agenda items for the week IG SRU meeting call to order Call for essential patents and policies & procedures reminder Approve meeting minutes IG SRU March 2013 Minutes ( r0) IG SRU April 2013 Telecon Minutes ( r0) Shoichi Kitazawa (ATR) Shoichi Kitazawa (ATR)

10 Agenda items for the week (Cont’d)
May 2013 Agenda items for the week (Cont’d) Presentations Proposal of radio resource management architecture ( r1) A Use Case of Self-Organizing Wireless Network for Medical System ( r0) IG SRU Usecase requirements ( ) WNG Table of Contents ( r0) IG-SRU Working Draft Usecases & Draft5C ( r0) Discussions Plan for July meeting AOB Report on progress to WG Shoichi Kitazawa (ATR)


Download ppt "May 2013 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IG SRU Opening Information for May 2013] Date."

Similar presentations


Ads by Google