1 Prices in Civil Engineering

2 Price on the Building Market
Change of goods between subjects on the building market Investor Side of demand Supplier Side of supply Negotiated price Prices in Civil Engineering

3 Prices in Civil Engineering
Law n. 526/1990 Coll., about prices, defines the price as amount of money: Agreed by the buying and sale of goods Using e. g. by building works price assessment Ascertained according to the special law for next purposes Price calculated according to the law about evaluation of property (law n. 151/1997 Coll., about evaluation of property) Prices in Civil Engineering

4 Price Agreement, Contract for Work
Price is agreed in the agreement about price mentioned in the contract for work Parties to contract are investor (buyer) and supplier Contract is agreed in the sense of the business code (law n. 513/1991 Coll.) Terms of contract for work: I. Parties to contract – investor, supplier II. Subject of delivery – building object, building work III. Time of delivery – time of finishing of the delivery IV. Price of delivery V. Payment conditions – the way of paying for deliveries VI. Qualitative and technical conditions VII. Realization of work VIII. Handover and takeover of building object – way of handover IX. Responsibility for defects, guarantee, warranty claims X. Avoidance of contract XI. Sanctions XII. Next agreements Prices in Civil Engineering

5 Building Object Price Assessment
Price of a building object includes all costs necessary for its preparation and realization Costs are divided into particular chapters From chapters there is created summary budget of building object Prices in Civil Engineering

6 Summary Budget of Building Object – Overview of Chapters
I Project and research works II Operational sets III Building part IV Machines and machinery V Artworks VI Subsidiary budget costs VII Other costs VIII Reserve IX Costs connected with land X Induced investments XI Operational costs for preparation and realization Prices in Civil Engineering

7 Summary Budget of a Building Object – Particular Chapters
I. Project and research works Project works: Activity of the building designer Author supervision Projects of demolitions, dismantling, if they are parts of the building realization Changes asked by investor Next agreed works in the frame of project documentation Models for project works Research works: Geological research and documentation Geodetic and cartographic works as groundwork for the project documentation creation Prices in Civil Engineering

8 Summary Budget of a Building Object – Particular Chapters
II. Operational sets Delivery and installation of machines and machinery functionally connected with the building objects (e.g. technological lines, elevators etc.) III. Building part Acquisition and delivery of building objects including all materials and works IV. Machines and machinery Machines and machinery not requiring installation during realization of building (high-lift trucks, test instrumentation, measuring instruments etc.) V. Artworks Sculptures, murals (immovable artworks connected with the building) Prices in Civil Engineering

9 Summary Budget of a Building Object – Particular Chapters
VI. Subsidiary budget costs (costs connected with the building site situation) Costs for building site accessories Costs connected with influence of extreme climate conditions Exceptionally bed travel conditions Transit of employees to building site and back Costs arising in case of working on listed buildings VII. Other costs Patents and licenses for realization Works of non-building organizations Realization of geodetic network Setting out of parks, plantations, vineyards, hop-gardens Prices in Civil Engineering

10 Summary Budget of a Building Object – Particular Chapters
VIII. Reserve reserve allowing e.g. the projection of changes in input material prices, wages etc. reserve allowing to cover higher price of building works during reconstructions IX. Costs connected with land buying of lands for own building realization payments for extraction of land from agricultural land resources rent for lands intended for building site X. Induced investments payments to other investors (e.g. necessity of relaying water pipes, gas pipes, sewerage, etc.) costs for buying of property intended for liquidation costs for not used projects alternatives Prices in Civil Engineering

11 Summary Budget of a Building Object – Particular Chapters
XI. Operational costs for preparation and realization organizational and preparation activity of investor: preparation of building site works inspector of investor preparation of the building operation work assembly of supplier: consultations by the building projects elaboration realization of building site accessories assurance of operation and maintenance of building site accessories takeover of building site accessories and handover of its parts to sub suppliers coordination of works of particular sub suppliers providing of building help out elaboration of documentation of real building realization attendance on building acceptation and handover of building to the phase of usage Prices in Civil Engineering

12 III. Building Part - Budget
Costs for building part are calculated as a sum of costs: for particular building works materials not included in the building work (valuated as a specification) shift with materials For calculation it is prepared the item budget Item budget includes following basic costs Item represents: building works material in specification Prices in Civil Engineering

13 Item of Budget of Building Part
Numeral code of item (Classification of Building Constructions and Works) Description of item Measure unit Amount of item in measure unit Unit price in e.g. CZK per measure unit Totally per item Unit weight in tons Weight in tons totally per one item Prices in Civil Engineering

14 Overview of Groups of Building Sections
Number Title of group of building sections General construction and works 1 Earthworks 2 Foundations, special foundations 3 Vertical and complete constructions 4 Horizontal constructions 5 Communications 6 Construction of surfaces, floors 7 Associated building production (handcrafts, installations) 8 Pipage, conduction 9 Finishing works, demolitions Prices in Civil Engineering

15 Data for the Budget Preparation
Documentation of building (drawings, design, technical report) Technologic processes Price catalogue of building works Price catalogues of material for valuation of materials in specifications Prices agreed with sub-suppliers Prices in Civil Engineering

16 Item of Budget of Building Part
Calculation of costs per item item totally in CZK = amount in m. u x Unit price of item in CZK/M. u.  Items totally = building part totally Prices in Civil Engineering

17 Negotiated Price of Building Delivery
Defined with help of budget Budget includes those chapters of summary budget that will be object of delivery Usually it concerns about: Building part – basic costs Subsidiary costs connected with the building situation Work assembly of supplier Agreed sub-supplies Value added tax Prices in Civil Engineering

18 Negotiated Price of Building Delivery – Acceptance Conditions
Delivery and qualitative conditions, for that the price is agreed, are defined in the contract of work. Mainly it concerns about: Kinds of works and their range (delimited in the project documentation) Quality (delimited by recommending government standards and technological processes) Prices in Civil Engineering