ESHAC Meeting #7 2017-10-09--10 Peter Jacobsson Head of ESH
OHS Outlook ESHAC Meeting #7 Peter Jacobsson Head of ESH 5 July, 2019
2
Outline Organization & Mission Status - Activities; April - September
Concerns & Challenges ahead
3
Radiation Protection (RP) Group Shielding Calculations
Environment, Safety & Health Division ESH Division Peter Jacobsson (HoD) Thomas Hansson François Javier Environment Erica Lindström Safety Training Lars Aprin CF Div/SEC Åsa A Johannesson Accelerator Div Lali Tchelidze Duy Phan Radiation Protection (RP) Group NN (Group Leader) Ida Bergström Alasdair Day Daniela Ene Tommy Hansson (c) Lena Johansson Per Persson XX (Rad Physics) YY (RPO) ZZ (RPT) Occupation Health & Safety (OHS) Group AA (Group Leader) Fredrik Jörud Jörgen Mattsson Michael Plagge Bertil Winér BB (OHS Eng.) Target Division TSS team NN (consultant) NSS Div Helena Ramsing ICS Division PSS team M Kurmar (consultant) Shielding Calculations G. Muhrer (TD)
4
OHS – Functional Description 1(2)
The OHS group is the expertise unit at ESS for OHS issues, responsible for stimulating risk assessment culture in compliance with regulations and internal rules regarding all work environment issues for staff, users and visitors. Development of rules, procedure & guidelines Electrical Chemical Fire & Explosive Equipment safety (lifts, rotating machines, cranes)
5
OHS – Functional Description 2(2)
Supporting the installation of the accelerator, target and the neutron scattering instruments made by ESS and its in-kind partners by providing expertise in risk assessment, risk mitigation and risk control Establish the rules & procedures for fire and rescue response procedures Emergency Preparedness Program OHS Committee
6
Status OHS at site 1(2) Four buildings have been handed over from SEC to ESS, i.e. ESS are in charge of the installation for these buildings Partial access have been given in one building Electrical Safety Permanent installation HV Grid; Electrical Operational Leader (EOL) - CF ESS Machinery installation; EOL – ESH Temporary installation EOL – Skanska Maskin Identified a need of having one common package of rules for the whole site Working group between ESH and CF/SEC
7
Buildings/Areas at site and other ESS areas
Electrical Safety ESS - Overall Person responsible for an Electrical Installation Ralf Trant ESS Grid Person responsible for an Electrical Installation (20 kV, 6 kV & 0,4 kV) Kent Hedin ESS – EL ESS - Person responsible for an Electrical Installation Jörgen Mattsson ESS LTH Teststand Nominated person in control of an electrical installation during work activities, EOL Mats Lindroos Nominated person in control of an electrical installation during work activities, EOL Buildings/Areas at site and other ESS areas Nominated person(s) in control of an electrical installation during work activities, EOL
8
Status OHS at site 2(2) Fire & Explosive Safety
Same plan (same staff) are used as for the other parts of ESS ESH participates at the weekly safety rounds (the whole site) Weekly coordination meeting
9
OHS - General Installation - Support
Procedures, rules and guidelines Uses the same resource as SEC Training Emergency Preparedness/Rescue Service SSM review comments Instructions – Rescue service Equipment AOB The exist laboratories Campus Office move
10
Commissioning – Test stand 2
Radiation Protection Established routines TLD´s for radiation monitoring Occupational Health Safety (OHS) Electrical Hazards Fire Hazards Interface with SEC/Skanska We are in an area where other installations/civil engineering work is on-going New staff from AD We have done this before We have partially done this before
11
Installation – Ion Source
Radiation Protection Established routines TLD´s for radiation monitoring Occupational Health Safety (OHS) Electrical Hazards Fire & Explosives Hazards New staff from AD First major installation from an In-Kind partner We have done similar work We have not done this before