1 Status of Combined Sewer Overflow Abatement
February 9-11, 2016 Agenda Item 12

2 Pennsylvania – 10 Communities
West Virginia – 10 Communities Ohio – 10 Communities Kentucky – 10 Communities Indiana – 7 Communities Illinois – 2 Communities

3

4

5 *New Boston is not required to submit a LTCP.

6 Long Term Control Plan (LCTP) Status
Pennsylvania RAJSA has had some delays in its LTCP implementation. DEP believes they have worked through those (not finalized) and expect the LTCP Task implementation to begin again soon. ALCOSAN has developed their LTCP/Wet Weather Plan (WWP). Agencies have reviewed it and require re-negotiation on some provisions of the existing Consent Decree (CD). Coraopolis Borough submitted a revised LTCP. The revised LTCP submittal is slated for Department review. West Virginia Benwood, Wheeling, McMechen, and Kenova have not had their LTCPs approved yet.

7 Long Term Control Plan (LCTP) Status
Ohio New Boston Facility will not be required to submit a LTCP. They are working towards elimination of their two CSOs.  Indiana Evansville has had their LTCP approved by the State. Kentucky    Owensboro has submitted a LTCP for approval. Ashland has had their LTCP approved by the State. Illinois Cairo has submitted a LTCP EZ Form. They are required to submit yearly reports showing efforts to secure grant funding to build a new effluent pump station and renovate the 10th Street Pump Station. This will provide a reduction of overflow events and volumes.

8 State Updates ALCOSAN is proposing to eliminate twelve (12) CSO outfall structures from their permit. Pennsylvania Agencies are attempting to incorporate more GI proposals within ALCOSANs WWP and outline them within the re-negotiated federal Consent Decree (CD). EPA plans to allow the City of Pittsburgh/PWSA to evaluate and develop a flow reduction proposal. EPA will be taking the lead on that Enforcement Order. Rochester, Middleport and Tell City have eliminated some CSOs.

9 Annual CSO Performance Data
ORSANCO staff has been working with Region 5 to retrieve CSO data for electronically through EPAs Integrated Compliance Information System (ICIS) database. This database will make gathering data easier in the future. The Communities are making progress by submitting performance data through electronic Discharge Monitoring Reports (DMR) as shown in the table below. Annual Performance data was only available for 21 of the 49 CSO Communities on the Ohio River.

10 State Summary of CSO Performance Data
This is a four year snapshot of the data and it is highly variable due to precipitation and lack of data from year to year. ORSANCO will continue to retrieve annual CSO performance data electronically and present the results to the Technical Committee. Illinois Indiana Kentucky Ohio 2012 Discharge Events 63 2017 799 2571 2013 Discharge Events 109 2202 853 2755 2014 Discharge Events 24 1908 724 1877 2015 Discharge Events 309 1769 850 2012 Duration (hrs) 6251 2945 966 2013 Duration (hrs) 10529 6605 2367 2014 Duration (hrs) 13404 3802 4196 2015 Duration (hrs) 10672 4967 2012 Flow (MG) 1048 227 1465 2013 Flow (MG) 3330 903 1968 2014 Flow (MG) 2937 369 2015 Flow (MG) 3001 277

11 Questions?