Download presentation
Presentation is loading. Please wait.
1
Overall Equipment Effectiveness (OEE)
Total Available time= 24 / 7 (168 hours per week) World Class (90%) (95%) (99%) (1) Shift pattern choices Actual Running Time Down- time Losses Availability Actual Running Time Total Time Available (2) Change-overs (3) Breakdowns (4) Planned Maintenance Actual Output in Running Time Speed Losses Rate Actual Output Possible Output in Actual Running Time (5) Speed Losses compared to BDP (6) Minor stoppages (< 30 seconds) Good Quality Output Quality Losses Quality Good Output All (Actual) Output (7) Quality defects - scrap (8) Start-up / Change-over losses Availability x Rate x Quality = OEE World Class Manufacturing OEE = > 85%
2
How to calculate… x = OEE = 35% x 90% x 97% = 31% x Availability 35%
65% Rate 90% 10% x 3% 31% 69% = OEE OEE = 35% x 90% x 97% = 31% 97% x Actual Output = 45,481 x Scrap / waste / NC = 1,364 x Good output (beyond QC) = 44,117 x Quality = 44,117 / 45,481 (*100%) = 97% Quality Total Time Available = 1,440 minutes Downtime Losses - 2 Shifts i.o 3 Shifts = minutes - 4 Changeovers = minutes - 56 Stoppages = minutes - Planned Maintenance = minutes Total = minutes Actual Running Time = minutes Availability = 504 / 1,440 (*100%) = 35% Actual Running Time = 504 minutes BDP Output per minute = 100 x Actual Output per minute = 96 x Possible Output = 50,400 x Actual Output = 45,481 x Rate = 45,481 / 50,400 (*100%) = 90%
Similar presentations
© 2025 SlidePlayer.com Inc.
All rights reserved.