Presentation is loading. Please wait.

Presentation is loading. Please wait.

After Action Review (AAR) Plan

Similar presentations


Presentation on theme: "After Action Review (AAR) Plan"— Presentation transcript:

1 After Action Review (AAR) Plan
TEMPEST EXPRESS 32 08-15 December 2017 Good morning/afternoon/evening. My name is . I am from the US PACIFIC COMMAND Training Directorate (J7). I am representing the multinational planning augmentation team (MPAT) secretariat. I would like to say a few words about the MPAT program. After Action Review (AAR) Plan

2 After Action Review (AAR)
Purpose: Improve MPAT TEMPEST EXPRESS planning and execution processes, and identify possible improvements to the Multinational Force Standing Operating Procedures (MNF SOP) Reviews: External Review: Where all participants, facilitators and SMEs will capture major issues concerning the TE-32 Staff Planning Workshop’s End State, Objectives, achievements and related issues that will be used to compile a formal written AAR Report SOP Review: Capture MNF SOP change recommendations based on use (testing) of the MNF SOP in TE-32

3 Review Collection Method: Utilize “Issues-Discussion-Recommendation” format Each Planning Group designate an AAR representative to ensure the Group provides input (seek 100% participation) for both TEMPEST EXPRESS 32 (TE-32) and comments to improve the MNF SOP The AAR Format Template with instructions will be posted in a Share Folder Each participant will fill the Format and save within the Group’s folder Input will be review and consolidated daily for use in preparing the Final AAR report The Group representative will provide clarification on the requirement as necessary Mr. Carey will be the point of contact TEMPEST EXPRESS 32 (TE-32) After Action Issue Identification Instructions and Format Purpose: To gather constructive information to improve future TEMPEST EXPRESS Staff Planning Workshops and data to consider for updating the MNF SOP. The goal is to achieve 100% participation.  Below is the format to be used. A statement is also provided to describing each piece of information required. For TE-32 data, please consider the following areas when providing your response: TE-32 End State, Objectives, their achievements and related issues including Academic and Planning. Feel free to provide additional comments about other aspects of the Workshop. Format: #1. Issue: State / Determine the issue if there is one. Issues can be good or not so good but, must be constructive. Discussion: Provide details about the issue.  Recommendation: Provide recommendations to resolve the issue. #2. Issue: xxx Discussion: xxx Recommendation: xxx

4 Questions?


Download ppt "After Action Review (AAR) Plan"

Similar presentations


Ads by Google