1 IMT-Advanced Overview - March 2007
Month Year doc.: IEEE /0374r1 March 2007 IMT-Advanced Overview - March 2007 Date: Authors: Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures < ieee802.org/guides/bylaws/sb-bylaws.pdf>, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE Working Group. If you have questions, contact the IEEE Patent Committee Administrator at Darwin Engwer, Nortel Networks Darwin Engwer, Nortel Networks

2 Month Year doc.: IEEE /0374r1 March 2007 Abstract An overview of IMT-Advanced and its relevance to IEEE 802 and , with particular emphasis on the predicted events at the March 2007 plenary session. Darwin Engwer, Nortel Networks Darwin Engwer, Nortel Networks

3 IMT-Advanced - Introduction
March 2007 IMT-Advanced - Introduction IMT-Advanced (i.e. systems beyond IMT-2000) is a new, global, unified wireless architecture Visualizes a hierarchy of interconnected access systems Envisions new radio interfaces Mobile class targets 100 Mbps with high mobility Nomadic/ local area class targets 1 Gbps with low mobility Includes operation on new (yet to be assigned) spectrum/ bands Licensed and maybe unlicensed IEEE 802 possibilities exist in IMT-Advanced Darwin Engwer, Nortel Networks

4 Possible Stages of an IEEE 802 response to ITU-R WP 8F on IMT-Advanced
March 2007 Possible Stages of an IEEE 802 response to ITU-R WP 8F on IMT-Advanced Stage Response Timeline 1 A high level response which indicates that IEEE 802 is working on IMT-Advanced, including a list of the working groups that are involved. Complete within IEEE 802 by end-of-week of the March 2007 plenary meeting for delivery to ITU-R WP8F prior to May 2007. 2 A more detailed response which provides specific requirements and evaluation methods (but not yet technical solutions) and includes information such as bit/ data rates, ranges, channel models, spectral efficiency, and so on. Complete within IEEE 802 by end-of-week of the November 2007 plenary meeting for delivery to ITU-R WP8F prior to Jan 2008. 3 A real proposal, which includes MAC+PHY and protocol details and specifications. Deliver to ITU-R WP 8F sometime in the 2008/2009 timeframe. 4 A final proposal for a complete standard for IMT-Advanced. This would be based on the IEEE 802 proposal from Stage 3, but may need to be modified in order to harmonize with other proposals from other SDOs. Deliver to ITU-R WP 8F sometime in the 2009/2010 timeframe. Darwin Engwer, Nortel Networks

5 Summary of Predicted IMT-Advanced Events This Week
March 2007 Summary of Predicted IMT-Advanced Events This Week Mon Tue Wed Thu Fri mid-week plenary: -report from Tues eve -motion to approve .18 output doc closing plenary: -consider forming a team to work on IMT-Advanced details open plenary: -Intro -Highlight week’s events 802 EC: -approve output document joint mtg -time = 20:00 -construct 1st IMTA response to ITU joint mtg: -time = ??? -confirm WG approval of 1st IMTA response AM PM EVE Darwin Engwer, Nortel Networks

6 Month Year doc.: IEEE /0374r1 March 2007 Suggested Actions The Chair, and a small team of supporting experts, should attend the Tuesday evening meeting to ensure is included in the Stage 1 response. should consider ratification the output document to ITU-R WP 8F at the mid-week plenary meeting on Wednesday morning. The Chair, as the voting representative in , should attend the Thursday evening meeting to confirm approval of the stage 1 input to ITU-R WP 8F on IMT-Advanced. Review the topic of IMT-Advanced during the closing plenary on Friday to determine if there is a need to form a team to perform more in depth investigations and craft the specific portions of a stage 2 response to ITU-R WP 8F. Darwin Engwer, Nortel Networks Darwin Engwer, Nortel Networks

7 March 2007 References RECOMMENDATION ITU-R M Framework and overall objectives of the future development of IMT 2000 and systems beyond IMT (Question ITU-R 229/8) introduction-to-imt-advanced.ppt imt-advanced-analysis-march-2007.doc Darwin Engwer, Nortel Networks