Presentation is loading. Please wait.

Presentation is loading. Please wait.

Figure 1. a) Location of the two study watersheds and land use in these two watersheds in 2008; b) Field allocation number and BMPs implemented in the.

Similar presentations


Presentation on theme: "Figure 1. a) Location of the two study watersheds and land use in these two watersheds in 2008; b) Field allocation number and BMPs implemented in the."— Presentation transcript:

1 Figure 1. a) Location of the two study watersheds and land use in these two watersheds in 2008; b) Field allocation number and BMPs implemented in the Steppler watershed since 2005.

2 Madill / Control watershed Steppler / Treatment watershed
Figure 2. Share of different forms of P and N in snowmelt and rainfall events in the total N and P exports, respectively, for the whole study period (1999 – 2008) at the Madill and Steppler watershed.

3 b) TN export (Ln(g ha-1)), all runoff events
a) TP export (Ln(g ha-1)), all runoff events Steppler / Treatment watershed value (Y) c) TP FWMC (Ln(mg L-1)), all runoff events d) TN FWMC (Ln(mg L-1)), all runoff events Madill / Control watershed value (X) Pre-period (calibration) Pre-period regression line Post-period (BMP implementation) Post-period regression line Figure 3. Simple regression analyses of TP and TN exports and Flow-Weighted-Mean-Concentrations (FWMCs) showing the effects of BMP implementation without accounting for the effects of hydrology variations.

4 a) N input, all fields b) P input, all fields c) N input, annual cropped fields d) P input, annual cropped fields e) N removal, all fields f) P removal, all fields g) N removal, annual cropped fields h) P removal, annual cropped fields i) N budget, all fields j) P budget, all fields k) N budget, annual cropped fields l) P budget, annual cropped fields Pre period Post period Madill Steppler Kg ha-1 yr-1 +7NS -26† +0NS -5** +14NS -16NS +4NS -4* +12NS -20NS +2NS +1NS -2NS -14NS -0NS -4NS -45* -1NS -6** +16NS -12NS +3NS -4† Figure 4. N and P input, removal and budget estimated from land use survey data for the Madill and Steppler watershed.


Download ppt "Figure 1. a) Location of the two study watersheds and land use in these two watersheds in 2008; b) Field allocation number and BMPs implemented in the."

Similar presentations


Ads by Google