Presentation is loading. Please wait.

Presentation is loading. Please wait.

TGT January 2006 Closing Report

Similar presentations


Presentation on theme: "TGT January 2006 Closing Report"— Presentation transcript:

1 TGT January 2006 Closing Report
doc.: IEEE /0050r0 January 2006 TGT January 2006 Closing Report Date: Authors: Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures < ieee802.org/guides/bylaws/sb-bylaws.pdf>, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE Working Group. If you have questions, contact the IEEE Patent Committee Administrator at Charles R. Wright, Azimuth Systems, Inc. C. Wright, Azimuth Systems

2 TGT Wireless Performance WG Report
January 2006 TGT Wireless Performance WG Report Charles R. Wright, Azimuth Systems, Inc.

3 TGT Progress during the week
January 2006 doc.: IEEE /0050r0 January 2006 TGT Progress during the week Met for 12 hours during the week Heard 9 presentations, including 5 proposals Accepted one proposal for inclusion into the draft 11-06/0007r0, “TGT Power Consumption Test Environment and Metrics” We expect the other 4 proposals to be improved and return in March Others expected as well coming out of some of the other presentations Next version of the draft will be D0.6 Updated “to-do list” (11-05/0912r3, slide 11) Planned for three teleconferences No permanent secretary Thanks to Don Berry, Larry Green for sharing the load Charles R. Wright, Azimuth Systems, Inc. C. Wright, Azimuth Systems

4 Presentations / Proposals
January 2006 doc.: IEEE /0050r0 January 2006 Presentations / Proposals 11-06/0008r1, “Power Consumption Measurements”, Sasha Tolpin (proposal: 11-06/0007r0) 11-06/0144r0, “Video Over Wireless Testing Methodology”, R. Fernald 11-06/0026r0, “OTA testing – comparing systems with different antennas” , P. Visuri 11-06/0033r0, “Outdoor Testing”, L. Green (for D.J. Shyy) 11-06/0129r0, “Non Noise Interference Testing”, D. Berry (proposal: 11-06/0127r0) 11-06/0088r0, “ACI Metric for OTA Indoor LOS”, N. Sharma (proposal: 11-06/0087r0) 11-06/0005r0, “Test Methodology for Measuring Loss, Delay and Jitter” , C. Trecker (proposal: 11-06/0004r0) 11-06/0078r1 “Handheld OTA LOS test methodology”, C. Warren 11-06/0132r0, “Traceable OTA Performance Testing”, M. Foegelle (proposal: 11-06/0131r0) 11-06/0050r0, TG closing report (this document) 11-06/0049r2, TG meeting slides 11-06/0143r0, TG minutes, when available Charles R. Wright, Azimuth Systems, Inc. C. Wright, Azimuth Systems

5 Telconferences Planned
January 2006 doc.: IEEE /0050r0 January 2006 Telconferences Planned TGT is planning teleconferences conducted on selected Thursdays between now and the January meeting Will be presented in the blanket telecon motion Dates: 26 Jan 06, 9 Feb 06, 23 Feb 06 12 noon US Eastern Time Phone info to be posted on reflector First telecon will be 26 Jan 06 Charles R. Wright, Azimuth Systems, Inc. C. Wright, Azimuth Systems


Download ppt "TGT January 2006 Closing Report"

Similar presentations


Ads by Google