1 Communication on ongoing processes - agreements on task 1 and 2

2 EEA and WFD communities
EEA management Board Water directors EEA EIONET /NFPs Steering Coordination Group Working Group D Reporting chair DG Env Drafting Group Compliance Chair Dg Env Drafting Group SOE/Trends Chair EEA NRCs for water and EIONET water Workshop

3 Task 1 EEA needs for data and information  indicator based assessments (Core set of indicators) Comparable information needs for EU-level picture Using: Monitoring-data-information-assessment-reporting (MDIAR) and DPSIR framework

4 Task 1 Eionet-water as starting point
Disaggregated data from monitoring sites to ensure comparability in assessments and to enable trend assessments Eionet-water needs to adapt to networks under WFD  subset of Art.8 reported set, coming from the same networks

5 Task 1 SOE reporting does not require additional monitoring but uses the the WFD monitoring network or monitoring under other directives Paper clarifies basic principles on Data versus information Frequency in sampling versus frequency in reporting annuality should be kept (only) where data are monitored annualy

6 Changes in task 1 paper after discussions in Working group reporting (WGD) and Steering Coordination Group (SCG) Task 1 paper final

7 Task 2 Review of existing guidance documents
Useful exercise to support set up of 2006 monitoring networks Doesn‘t need to be part of SOE-guidance document

8 Further process Completed papers on task 1 and 2 agreed background information in the WFD community to be reported to NFPs and EEA Management Board Task 1 paper into introduction in future guidance document (which will be mainly documents on Task 3, 4 and 5) Final guidance for WD and EEA MB in November 2007

9 Further comments Urgent request from SCG (AT) to present the first set of final draft reporting sheets already in June 2007 Water Directors meeting in Germany  Align progress with discussion on 2010 reporting sheets in compliance drafting group