20-21 June 2017 European Spallation Source FCC study – Design solutions being proposed by the Infrastructures & Operations Working Group Updated to FCC week 2017 S. La Mendola HSE/SEE/XP 27-May-19 EDMS no:

3 Summary Civil engineering; Integration; Electrical distribution;
Air management; (Reliability); Safety strategy; Discussion; Full presentations available at 27-May-19 EDMS no:

4 FCC Civil Engineering Optimisation and Design Development, John Osborne & Joanna Stanyard
Shaft at point F is 476 meters deep! 27-May-19 EDMS no:

5 FCC Civil Engineering Optimisation and Design Development, John Osborne & Joanna Stanyard
Shafts F and G are removed in this option. 30 km long bypass tunnel. 27-May-19 EDMS no:

6 FCC Civil Engineering Optimisation and Design Development, John Osborne & Joanna Stanyard
27-May-19 EDMS no:

7 FCC Civil Engineering Optimisation and Design Development, John Osborne & Joanna Stanyard
27-May-19 EDMS no:

8 FCC Civil Engineering Optimisation and Design Development, John Osborne & Joanna Stanyard
27-May-19 EDMS no:

9 Civil engineering for FCC-eh Interaction Region
FCC Civil Engineering Optimisation and Design Development, John Osborne & Joanna Stanyard Civil engineering for FCC-eh Interaction Region 27-May-19 EDMS no:

10 Underground structures, F. Valchkova-Georgieva
27-May-19 EDMS no:

11 6 m FCC-hh 3D, dipole, compartment wall/cryogenic jumper, transport vehicle F. Valchkova-Georgieva
27-May-19 EDMS no:

12 Shafts, F. Valchkova-Georgieva
27-May-19 EDMS no:

13 Underground structures, F. Valchkova-Georgieva
27-May-19 EDMS no:

14 Tunnel cross section, FCC-hh, F. Valchkova-Georgieva
27-May-19 EDMS no:

15 Supply and distribution of Electrical Energy, Davide Bozzini
27-May-19 EDMS no:

16 Supply and distribution of Electrical Energy, Davide Bozzini
Second and third source as well as uninterruptable supply are also defined 27-May-19 EDMS no:

17 Supply and distribution of Electrical Energy, Davide Bozzini
27-May-19 EDMS no:

18 A ventilation system for the FCC tunnel, M. Nonis, G. Peon
27-May-19 EDMS no:

19 A ventilation system for the FCC tunnel, M. Nonis, G. Peon
27-May-19 EDMS no:

20 A ventilation system for the FCC tunnel, M. Nonis, G. Peon
27-May-19 EDMS no:

21 A ventilation system for the FCC tunnel, M. Nonis, G. Peon
27-May-19 EDMS no:

22 A ventilation system for the FCC tunnel, M. Nonis, G. Peon
Concept developed also for Cryo, d and b collimation, RF and beam dump points 27-May-19 EDMS no:

23 A ventilation system for the FCC tunnel, M. Nonis, G. Peon
27-May-19 EDMS no:

24 FCC availability studies, Andrea Apollonio, Arto Niemi
Interesting approach: could be applied to safety systems; Note: accidental events (e.g. fire) were not included in the study; 27-May-19 EDMS no:

25 FCC safety strategy for the Conceptual Design Report, Th. Otto
27-May-19 EDMS no:

26 FCC safety strategy for the Conceptual Design Report, Th. Otto
27-May-19 EDMS no:

27 FCC safety strategy for the Conceptual Design Report, Th. Otto
27-May-19 EDMS no:

28 FCC safety strategy for the Conceptual Design Report, Th. Otto
27-May-19 EDMS no:

29 FCC safety strategy for the Conceptual Design Report, Th. Otto
27-May-19 EDMS no:

30 FCC safety strategy for the Conceptual Design Report, Th. Otto
27-May-19 EDMS no:

31 FCC safety strategy for the Conceptual Design Report, Th. Otto
27-May-19 EDMS no:

32 FCC safety strategy for the Conceptual Design Report, Th. Otto
27-May-19 EDMS no:

33 FCC safety strategy for the Conceptual Design Report, Th. Otto
27-May-19 EDMS no:

34 FCC safety strategy for the Conceptual Design Report, Th. Otto
27-May-19 EDMS no:

35 Open discussion Length of fire compartments;
Compatibility of compartmentalization with Helium spill; Early fire extinguishing, guided evacuation and search & rescue by rail-mounted robots; Shaft cross section (protected stairs with no intermediate landings); Use of alcoves as rest areas (separate compartment); Hi voltage distribution in the tunnel / (dry) electrical transformers in the alcoves; Ventilation / smoke extraction system Safety approach Etc. 27-May-19 EDMS no:

36 Thank you for your attention!
27-May-19 EDMS no:

37 27-May-19 EDMS no:


Download ppt "Workshop on fire protection for physics research facilities"

Similar presentations


Ads by Google