Presentation is loading. Please wait.

Presentation is loading. Please wait.

DSC Change Committee Summary – 7th March

Similar presentations


Presentation on theme: "DSC Change Committee Summary – 7th March"— Presentation transcript:

1 DSC Change Committee Summary – 7th March
The CPs from last month were progressed to ROM stage XRN3656 – Change to read validation tolerances XRN4576 – Class 4 Transfer Reads not visible to Shippers in DES 2 new change proposals raised – sent to DSC Delivery Sub Group to consider XRN Suspension of the Validation between Meter Index and Uncoverted Converter Index XRN Incrementing Reads on Isolation Supply Meter Points EQR - XRN4328 – Report of iGT Meter Points where the confirming shipper is not the elected shipper – approved EQR & BER - XRN4354 – Request for DNO report of nested CSEPs hierarchy CCN - XRN4380 – Monthly Nomination Referral Report Approved proposed to close changes and changes requiring sponsorship Update on release 2 progress – on track Release 3 scope amendments – 3 changes approved to de-scope and 1 for discussion at DSG


Download ppt "DSC Change Committee Summary – 7th March"

Similar presentations


Ads by Google