Presentation is loading. Please wait.

Presentation is loading. Please wait.

Eaton MEDC, Sutton-In-Ashfield

Similar presentations


Presentation on theme: "Eaton MEDC, Sutton-In-Ashfield"— Presentation transcript:

1 Eaton MEDC, Sutton-In-Ashfield
Value of contract: Length of contract: Contract start date: Completion date: £1.1 M 9 months May 2017 January 2018 Works/services provided: Mass concrete foundations Erection of Portal steel frame, mezzanine floor with metal deck and concrete subfloor Blockwork superstructure with Metal deck and concrete roof Alteration to exst steel structure and composite cladding Steel fire escape staircases and landings UPVC, Aluminium & timber door & window systems HVAC systems & Energy efficient electrical installation and data cabling High Quality Internal fit out and finishes Detailed description of contract: The project involves alterations and extensions to an existing warehouse at Unit B Gateway 28, Including construction of 1200m² of new two storey office accommodation within the existing production facility. The scheme encompasses alteration and refurbishment of existing first floor office space to create an inviting open plan working environment with efficient electrical and HVAC systems. Particular challenges to be overcome: Contact details: Phased programming to enable business continuity of the production facility (Circa 1m Units per week) Achieving key completion dates to enable ‘business critical’ staff re-location Containment of extensive demolition works directly adjacent to a live production area with high dust sensitivity Partial strip out and alteration of ‘Live’ building services and production control equipment whilst maintaining continued service in all adjacent areas Mr Shaun Black - Production Eng Manager Eaton MEDC Unit B Sutton Parkway Oddicroft Lane Sutton-in-Ashfield. NG17 5FB Tel:


Download ppt "Eaton MEDC, Sutton-In-Ashfield"

Similar presentations


Ads by Google