Presentation is loading. Please wait.

Presentation is loading. Please wait.

UR 1.0 Experiences OGF 24, Singapore.

Similar presentations


Presentation on theme: "UR 1.0 Experiences OGF 24, Singapore."— Presentation transcript:

1 UR 1.0 Experiences OGF 24, Singapore

2 OGF IPR Policies Apply “I acknowledge that participation in this meeting is subject to the OGF Intellectual Property Policy.” Intellectual Property Notices Note Well: All statements related to the activities of the OGF and addressed to the OGF are subject to all provisions of Appendix B of GFD-C.1, which grants to the OGF and its participants certain licenses and rights in such statements. Such statements include verbal statements in OGF meetings, as well as written and electronic communications made at any time or place, which are addressed to: the OGF plenary session, any OGF working group or portion thereof, the OGF Board of Directors, the GFSG, or any member thereof on behalf of the OGF, the ADCOM, or any member thereof on behalf of the ADCOM, any OGF mailing list, including any group list, or any other list functioning under OGF auspices, the OGF Editor or the document authoring and review process Statements made outside of a OGF meeting, mailing list or other function, that are clearly not intended to be input to an OGF activity, group or function, are not subject to these provisions. Excerpt from Appendix B of GFD-C.1: ”Where the OGF knows of rights, or claimed rights, the OGF secretariat shall attempt to obtain from the claimant of such rights, a written assurance that upon approval by the GFSG of the relevant OGF document(s), any party will be able to obtain the right to implement, use and distribute the technology or works when implementing, using or distributing technology based upon the specific specification(s) under openly specified, reasonable, non-discriminatory terms. The working group or research group proposing the use of the technology with respect to which the proprietary rights are claimed may assist the OGF secretariat in this effort. The results of this procedure shall not affect advancement of document, except that the GFSG may defer approval where a delay may facilitate the obtaining of such assurances. The results will, however, be recorded by the OGF Secretariat, and made available. The GFSG may also direct that a summary of the results be included in any GFD published containing the specification.” OGF Intellectual Property Policies are adapted from the IETF Intellectual Property Policies that support the Internet Standards Process. IPR Notices Note Well for OGF meetings 2

3 Outline Experience Document Identified Use Cases Objectives
Survey Template Call for more use cases and correctness Identified Use Cases APEL/WLCG DGAS/EGEE RUS Accounting Service/UNICORE SGAS/SweGrid Gratia/OSG ARCO/SGE UAS/NGS 3

4 Experience Document Objectives Use case collection
Implementation status Consolidate advanced requirements Guiding to next release (version 2) Reflective to RUS WG 4

5 Experience Document Execution Process 5

6 Survey Template Six parts
Project Description Usage Metric checklist Extensions (if any) Metering time High-level usage Recommendation to UR2 Roadmap Feedbacks Available at: 6

7 Current Status Summarized from JISC report
Full version available at ( UR-specific version available at ( Call for updated information (of identified use cases) Call for more use cases especially for non-CPU accounting 7

8 Identified Use Case - APEL
Accounting Processor for Event Logs Accounting system of WLCG Used for reporting usage statistics Components Log parser R-GMA as publishing protocol Reporting portal 8

9 Identified Use Case - APEL
APEL Workflow 9

10 Identified Use Case - APEL
APEL Workflow 10

11 Identified Use Case - APEL
APEL Workflow 11

12 Identified Use Case - APEL
APEL Workflow 12

13 Identified Use Case - APEL
APEL Workflow 13

14 Identified Use Case - APEL
APEL Workflow 14

15 Identified Use Case - APEL
APEL Workflow 15

16 Identified Use Case - APEL
APEL Workflow 16

17 Identified Use Case - APEL
APEL Workflow 17

18 APEL Schema & UR 18

19 Identified Use Case - DGAS
Distributed Grid Accounting System Accounting system of EGEE Used of economic accounting (economic authorization, pricing, banking, etc) Components User Interface (UI) Workload Manager Price Authority Home Location Registry (HLR) Sensor 19

20 Identified Use Case - DGAS
Workflow 20

21 Identified Use Case - DGAS
Workflow 21

22 Identified Use Case - DGAS
Workflow 22

23 Identified Use Case - DGAS
Workflow 23

24 Identified Use Case - DGAS
Workflow 24

25 Identified Use Case - DGAS
Workflow 25

26 Identified Use Case - DGAS
Workflow 26

27 Identified Use Case - DGAS
Workflow 27

28 Identified Use Case - DGAS
Workflow 28

29 Identified Use Case - DGAS
Workflow 29

30 Identified Use Case - DGAS
Workflow 30

31 Identified Use Case - DGAS
Workflow 31

32 DGAS Schema and UR (1) Usage Schema of ATM Client API 32

33 DGAS Schema and UR (1) DGAS URWG Metering Client
Generates OGF-UR (v1) compatible records in XML; With additional extensions that are economic activity specific 33

34 Identified Use Case – UNICORE Accounting System
Used by UNICORE Mainly for real-time job usage monitoring Deployed at a specific site only No aggregation/summarization Component URF Generator Metering and compose usage records RUS Resource Usage Service LLView Usage monitoring application 34

35 Identified Use Case – UNICORE Accounting System
Workflow 35

36 Identified Use Case – UNICORE Accounting System
Workflow 36

37 Identified Use Case – UNICORE Accounting System
Workflow 37

38 Identified Use Case – UNICORE Accounting System
Workflow 38

39 Identified Use Case – UNICORE Accounting System
Workflow 39

40 Identified Use Case – UNICORE Accounting System
Workflow 40

41 Identified Use Case – UNICORE Accounting System
Workflow 41

42 Identified Use Case – UNICORE Accounting System
Workflow 42

43 Identified Use Case – UNICORE Accounting System
Workflow 43

44 UNICORE Schema and URv1 URv1 compatible Extensions? 44

45 Identified Use Case - SGAS
SweGrid Accounting System Globus accounting component Widely deployed for Nordic sites Mainly for economic accounting Components Job Account Reservation Manager Economic authorization Bank service Banking Logging and Usage Tracking Service RUS implementation for usage query 45

46 Identified Use Case - SGAS
Workflow 46

47 Identified Use Case - SGAS
Workflow 47

48 Identified Use Case - SGAS
Workflow 48

49 Identified Use Case - SGAS
Workflow 49

50 Identified Use Case - SGAS
Workflow 50

51 Identified Use Case - SGAS
Workflow 51

52 Identified Use Case - SGAS
Workflow 52

53 SGAS Schema and URv1 UR extensions Extension Description
OGF UR Mapping VOName Virtual Organization Name 53

54 Identified Use Case - UAS
User Accounting System Used by UK NGS Mainly for usage monitoring against allocated quotas on per user basis Component Jbmdb module Capture use/job mapping info. by parsing globus log files Batch2UR Metering local resource usage UR generator RUS User Accounting Protal 54

55 Identified Use Case - UAS
Workflow 55

56 Identified Use Case - UAS
Workflow 56

57 Identified Use Case - UAS
Workflow 57

58 Identified Use Case - UAS
Workflow 58

59 Identified Use Case - UAS
Workflow 59

60 Identified Use Case - UAS
Workflow 60

61 Identified Use Case - UAS
Workflow 61

62 Identified Use Case - UAS
Workflow 62

63 Identified Use Case - UAS
Workflow 63

64 Identified Use Case - UAS
Workflow 64

65 UAS schema and URv1 Extensions 65

66 Identified Use Case - Gratia
Accounting system used for OSG Mainly usage reporting Components Probe Metering and generate usage record files Collector Gathering usage records Publisher Web portal 66

67 Identified Use Case - Gratia
Workflow 67

68 Identified Use Case - Gratia
Workflow 68

69 Identified Use Case - Gratia
Workflow 69

70 Identified Use Case - Gratia
Workflow 70

71 Identified Use Case - Gratia
Workflow 71

72 Identified Use Case - Gratia
Workflow 72

73 Gratia database Model 73

74 Gratia database Model 74

75 Identified Use Case - ARCO
Accounting and Reporting Console Used specific to Sun Grid Engine Mainly for usage reporting Components DBWriter Metering resource usage Web-based console tool Graphic reporting portal 75

76 Identified Use Case - ARCO
Workflow 76

77 Identified Use Case - ARCO
Workflow 77

78 Identified Use Case - ARCO
Workflow 78

79 Identified Use Case - ARCO
Workflow 79

80 Identified Use Case - ARCO
Workflow 80

81 ARCO Schema and UR 81

82 What’s Next? Updates of identified use cases More use cases?
Consolidation Document Editing 82

83 Full Copyright Notice Copyright (C) Open Grid Forum (2008). All Rights Reserved. This document and translations of it may be copied and furnished to others, and derivative works that comment on or otherwise explain it or assist in its implementation may be prepared, copied, published and distributed, in whole or in part, without restriction of any kind, provided that the above copyright notice and this paragraph are included on all such copies and derivative works. The limited permissions granted above are perpetual and will not be revoked by the OGF or its successors or assignees. OGF Full Copyright Notice if necessary 83


Download ppt "UR 1.0 Experiences OGF 24, Singapore."

Similar presentations


Ads by Google