LAMAS Working Group 6-7 December 2017

Similar presentations


Presentation on theme: "LAMAS Working Group 6-7 December 2017"— Presentation transcript:

1 LAMAS Working Group 6-7 December 2017
Agenda Item 2.8 MUR Implementing Regulation Eurostat

2 OUTLINE I. Background II. Results of LAMAS consultation III. Proposed changes in MUR regulation IV. Exchange of views V. Conclusions

3 I. BACKGROUND Rationale for a MUR implementing act
Principal European Economic Indicator High visibility Various methods in use with no common quality framework Main issues discussed at LAMAS of June 2017 Status of quality indicators Transmission, every 3 years, of monthly LFS results for quality monitoring

4 II. LAMAS consultation

5 II. LAMAS consultation

6 III. PROPOSED CHANGES in MUR Regulation
Quality indicators moved from core text to annex 2. No requirement to transmit monthly LFS data 3. Main other changes First transmission synchronized with LFS under IESS => 25 June N at the latest, earlier transmissions welcome Requirements for back series aligned with LFS under IESS => 25 May N+1 at the latest, earlier transmissions welcome

7 Calendar for options 1 (LFS) and 3 (national hybrid):
25 June N: 25 Apr N+1: 25 May N+1:

8 Calendar for option 2 countries:
(monthly registered unemployment inputs) 25 June N:

9 IV. Exchange of Views Q1. Do you agree on synchronizing the first transmission of MUR and LFS data (see Article 4)? Answers Ratio Yes 24 70.59% No 0% Don't know 7 20.59% No Answer 3 8.82%

10 Q3. Do you agree on aligning the back series requirements for MUR and LFS data (see the new Article 5)? Answers Ratio Yes 19 55.88% No 1 2.94% Don't know 10 29.41% No Answer 4 11.76%

11 Transition period (JAN N – JUNE N):
Question: Shall we stop transmitting MUR data? Answer: => NO, current gentlemen's agreement still applicable => MUR data to be transmitted in June N at the latest => No intention to suspend the MUR release

12 Break-free series: Question: When shall MSs start transmitting break-free MUR? Answer: => As soon as published nationally (idem quarterly series) => At the latest by 25 May N+1 => MUR series transmitted shall be consistent with the quarterly series transmitted (at all times)

13 Other comments: - Consistency between monthly and quarterly data to be
added as a quality criterion (AT); - Drafting suggestions (e.g. LV, PL) to be considered in a revised (post-LAMAS) version; (ECB on trend / SA data, NO on moving averages, FI on deviations from uniform sample distribution, PT on Christmas break, PL on back series for monthly inputs, UK on derogations for 1st transmission of MUR data, ).

14 Other comments: - Trend data, 3 Months Moving Averages, etc. not
excluded (NO input harmonization) but also assessed through the MUR quality criteria mentioned in annex (output harmonization); - Other specific comments will be handled bilaterally. => s to send to: => Before 14 December (ECB on trend / SA data, NO on moving averages, FI on deviations from uniform sample distribution, PT on Christmas break, PL on back series for monthly inputs, UK on derogations for 1st transmission of MUR data, ).

15 V. CONCLUSIONS The LAMAS delegates are invited:
To take note of the results of the LAMAS consultation To agree / comment on the revised version of the MUR regulation To agree that a revised draft be circulated after LAMAS To note that this (post-LAMAS) version will be the basis for further discussions e.g. at DSS level

16 Thank you for your attention!


Download ppt "LAMAS Working Group 6-7 December 2017"

Similar presentations


Ads by Google