1 INVESTMENT PROJECT #14 PRODUCTION OF PRODUCTION PETROL, DIESEL AND GAZ GENERATORS
Preliminary cost of the project – 2,5 mln. USD (equipment, installation and others); Project initiator – “Potok Azia” LLC; Possible annual production capacity – 100 pcs per year; Annual domestic demand – pcs per year; Current manufacturers – “Union Energy Systems“ GC,“TSS“GC, “Energy Holding“ LLC, CJSC “MPZ”, “VETZ-energy-systems”; Existent annual capacity – 50 pcs per year; Available raw materials – Gasoline, Diesel Fuel, metal; Required infrastructure - water, electricity, gas, canalization, automobile road, heat; Export volume – up to 30 % of total production capacity to СIS and other countries; Number of new work places – 16 persons; Equipment supplying countries – China, Korea and Japan. 33

2 INVESTMENT PROJECT #15 PRODUCTION OF TEXTILE PRODUCTS
Preliminary cost of the project – 35 mln USD (equipment, construction, installation and others); Project initiator – “Jizzak suntex” LLC Possible annual production capacity – tons per year; Annual domestic demand – tons per year; Current manufacturers –“Plastex”, “Fergana DEU textile”, “Horezm Alisher Textile”, “Kabul textile” (not functioning); Existent annual capacity – tons per year Available raw materials – cotton; Required infrastructure- water, electricity, gas, canalization, automobile road, heat; Export volume- 70% per year to СIS countries and etc; Number of new work places – 600; Equipment supplying countries – Germany. 35

3 INVESTMENT PROJECT #16 PRODUCTION OF BRICKS
Preliminary cost of the project – 1.2 mlrd. sum (equipment, construction, installation and others); Project initiator – «Tovoqsoy Qurilish Mollari» PE; Possible annual production capacity – pcs per year; Current manufacturers – “Zebo Business”, “Gazalkent Qurilish Mollari”, “Bostonliq Gisht zavodi”; Existent annual capacity – pcs per year; Required infrastructure - water, electricity, gas, canalization, automobile road, heat; Export volume- 50 % of the total value to Kirgizia and Kazakhstan; Number of new work places – 12; Equipment supplying countries – Russia, China. 36

4 INVESTMENT PROJECT #17 PRODUCTION OF SPINNING
Preliminary cost of the project – 2.5 mln USD (equipment, construction, installation and others); Project initiator – “Rushantex”LLC; Possible annual production capacity – meters per year; Current manufacturers – JV “Textiles Spectrum Colors”, “Naksh Oydin”LLC; Required infrastructure- water, electricity, gas, canalization, automobile road, heat; Existent annual capacity – meters per year; Available raw materials – cotton; Export volume % per year to СIS countries and etc; Number of new work places – 18; Equipment supplying countries – Germany, Switzerland. 37

5 INVESTMENT PROJECT #18 PRODUCTION OF GLASSWARE
Preliminary cost of the project – 6 mln USD (equipment, installation and others); Project initiator – «Horazm shisha idishlari »; Possible annual production capacity – 200 mln items per year; Annual domestic demand 650 mln items per year; Current manufacturers – “Kvarz” Ltd, “Asyl Oina”, “Glasstid”; Existent annual capacity mln items per year; Required infrastructure- water, electricity, gas, canalization, automobile road, heat; Available raw materials – salpeter, potassium soda, chalk-stone, sodium sulfate, quartz sand Export volume - 14 mln items per year to СIS countries and Afghanistan; Number of new work places – 25-30; Equipment supplying countries – China. 38

6 INVESTMENT PROJECT #19 PRODUCTION OF MOHAIR PRODUCTS
Preliminary cost of the project – 300 mln USD (equipment, installation and others); Project initiator – ООО “Onorzor Umbir Ahmad”; Possible annual production capacity – square meters of mohair towels, pcs of mohair blankets and pcs of mohair robes per year; Current manufacturers – “Namangan momiq”, “BF Textile”; Existent annual capacity – square meters of mohair towels, pcs of mohair blanket and pcs of mophair robes per year; Available raw materials – Yarn; Required infrastructure - water, electricity, gas, canalization, automobile road, heat; Export volume- 62% items per year to СIS countries; Number of new work places – 40; Equipment supplying countries – China. 39

7 INVESTMENT PROJECT #20 PRODUCTION OF CONSTRUCTION MATERIALS
Preliminary cost of the project – – USD (equipment, installation and others); Project initiator – “Namuna” Ltd; Possible annual production capacity – 5872 items per year; Current manufacturers – AS “Kvarz”, “Andpolic” JV; Available raw materials – cement; Required infrastructure - water, electricity, gas, canalization, automobile road, heat; Export volume items per year to СIS countries; Number of new work places – 25; Equipment supplying countries – China. 40

8 INVESTMENT PROJECT #21 PRODUCTION CARBON DIOXIDE AND LIME
Preliminary cost of the project – 1,5 mln USD (equipment, installation and others); Project initiator – “Dioksid Biznes”LLC; Possible annual production capacity – tons carbon dioxide and 540 tons lime per year; Current manufacturers – “Chirchik-Maksan”JV, “Bektimir spirt”LLC; Existent annual capacity – 750 tons of carbon dioxide per year; Required infrastructure - water, electricity, gas, canalization, automobile road; Export volume % of total volume per year to СIS countries; Number of new work places – 40-50; Equipment supplying countries – Uzbekistan. 41

9 INVESTMENT PROJECT #22 PRODUCTION OF FRESH AND CANNED MUSHROOMS
Preliminary cost of the project – 350 thousand USD(equipment, installation and others); Project initiator – “For Creot Development”SD; Possible annual production capacity – 300 tons of fresh mushrooms and 250 tons of canned mushrooms per year; Annual domestic demand – (after domestic producers products) items per year; Available raw materials – cotton shell, glass containers, twist cap; Required infrastructure - water, electricity, gas, canalization, automobile road, heat; Existent annual capacity – 240 tons of fresh mushrooms and 200 tons of canned mushrooms per year; Export volume- 50% of canned mushrooms per year to СIS countries; Number of new work places – 20; Equipment supplying countries – Uzbekistan. 42

10 INVESTMENT PROJECT #23 PRODUCTION OF HOUSEHOLD
Preliminary cost of the project – 800 thousand USD(equipment, installation and others); Project initiator – “Adana Production Group”LLC; Possible annual production capacity – tons of laundry detergent for hand washing, tons of laundry detergent for machine washing and tons of universal detergents per year; Annual domestic demand – 20% (after domestic producers products) items per year; Available raw materials – sodium sulfate, sodium metasilicate, soda ash and etc; Required infrastructure - water, electricity, gas, canalization, automobile road, heat; Existent annual capacity – tons of laundry detergent for hand washing , tons of laundry detergent for machine washing and tons of universal detergents per year ; Export volume- 30% per year to СIS countries; Number of new work places – 100; Equipment supplying countries – China, Turkey. 42

11 INVESTMENT PROJECT #24 PRODUCTION OF PIGMENTS AND DYES FOR THE TEXTILE INDUSTRY
Preliminary cost of the project – 800 thousand USD(equipment, installation and others); Project initiator – “Delvita Trade”LLC; Possible annual production capacity – tons of pigments and dyes for the textile industry per year; Annual domestic demand – 500 tons (after domestic producers products) per year; Current manufacturers – “Pigment”, “Bersa group”, “Basf group”; Available raw materials – technical ammonia, glycerin, sulfuric acid, acetic acid, water ; Required infrastructure - water, electricity, gas, canalization, automobile road, heat; Existent annual capacity – 500 tons of pigments and dyes for the textile industry per year; Export volume- 50% tons per year to СIS countries; Number of new work places – 30; Equipment supplying countries – India, Germany. 42

12 INVESTMENT PROJECT #25 PRODUCTION, STORAGE OF FRUITS AND VEGETABLES
Preliminary cost of the project – 498 thousand Euro(equipment, installation and others); Project initiator – “Nagohon Auto Texservis”PE; Possible annual production capacity – tons of apples, 500 tons of grapes, 500 tons of pears, 500 tons grenades, 150 tons of plums per year; Annual domestic demand – 500 tons of apples, 250 tons of grapes, 100 tons of pears, 100 tons grenades, 50 tons of plums (after domestic producers products) per year; Available raw materials – apples, grapes, pears, grenade and plums; Required infrastructure - water, electricity, gas, canalization, automobile road, heat; Existent annual capacity – 500 tons of apples, 250 tons of grapes, 100 tons of pears, 100 tons grenades, 50 tons of plums ; Export volume- 70% tons per year to СIS countries; Number of new work places – 30; Equipment supplying countries – Holland, Belgium. 42