NIG. POWER SECTOR REFORM (REQUIREMENTS FOR THE NEXT LEVEL)

2 Overview of Power Sector Reform
Challenges Arising from Privatization Status of NEM at Inception of President Buhari’s Government

3 Transmission Company Of Nigeria (TCN)
Organizational Structure Finance/Audit/Procurement Project Management

4 Transmission Rehabilitation and Expansion Program (TREP) Rehabilitate, Stabilize, Provide Necessary Flexibility, Redundancies and Expand the Wheeling Capacity to 20,000MW Frequency control Spinning Reserve SCADA/EMS/Telcoms Critical Investments in Lines and Substations Underperforming contracts Use of in-house capacity/Recovery of Stranded 730 containers Re-conducting of 132kV lines Donor Funded Projects

5 TREP 1 NETAP/NEGIP Abuja Scheme Northern Corr. NTEP Lagos/Ogun North Core TREP 2 Lagos 330kV Loop Eko Atlantic Supply Central Back Bone Ugweli-Okpai Ugweli-PH Omotosho-Benin North WAPP Priority Project 2nd Coastal Back Bone Eastern Back Bone Median Back Bone

6 Eligible Customers Background Objective Increase liquidity of NEM
Ease of doing business of industries Reduction in government guarantees

7 DISCO Investment/EMTECH Energy
SN DISCO ADDED INTERFACE CAPACITY # 33kV FEEDERS REQUIRED 2×15MVA 33/11kV INJECTION SUBSTATIONS REQUIRED AVERAGE FEEDER LENGTH IN DISCO(km) COST OF FEEDER ($) COST OF INJECTION STATION ($) TOTAL ($) 1 AEDC 1480 99 140.3 109.25 474,999,588 67,803,375 542,802,964 2 BEDC 880 59 55.6 78 202,107,862 26,858,649 228,966,511 3 EKO EDC 820 55 14.7 21 231,257,430 7,104,312 238,361,742 4 ENUGU EDC 700 47 67.3 129 266,271,179 32,545,620 298,816,799 5 IBEDC 1020 68 95.4 326,262,344 46,106,295 372,368,639 6 IKEJA EDC 1300 87 123.5 417,423,881 59,666,970 477,090,851 7 JOS EDC 800 53 57.78 142 330,522,331 27,924,296 358,446,627 8 KAD EDC 900 60 33.4 165 434,782,232 16,151,436 450,933,668 9 KN EDC 480 61 206.2 133 356,301,843 99,629,520 455,931,363 10 PHEDC 720 48 32.64 85 282,213,194 15,774,473 297,987,667 11 YOLA EDC 1200 80 240 121 425,120,405 115,988,769 541,109,174 GRAND TOTAL 3,747,262,289 515,553,717 4,262,816,005

8 Discos’ 33kv Feeders with Injection Substations and those with Direct Loads
S/N NAME OF DISCO TOTAL NO. OF 33KV FEEDERS NO. OF FEEDERS PURELY CONNECTED TO INJECTION S/Ss NO. OF FEEDERS CONNECTED TO INJECTION S/Ss AND MIXED WITH DIRECT LOADS NO. OF FEEDERS WITHOUT INJECTION S/Ss COMPLIANT FEEDERS (%) 1 ABUJA 88 54 3 31 61% 2 BENIN 66 34 23 9 52% EKO 94 84 7 89% 4 ENUGU 68 17 20 46% 5 IBADAN 107 32 49 26 30% 6 IKEJA 77 8 88% JOS 43 40% KADUNA 50 35 13 70% KANO 15 65% 10 PORT HARCOURT 62 19 24 31% 11 YOLA 33 45% TOTAL 737 421 139 177 57%

9 Requirements for the Next Level
Full and Complete Implementation of TREP Capitalization of the DISCO’s Competitive Procurement of Generation Full integration of Solar into the Grid Competitive and Sustainable Electricity Market.