Presentation is loading. Please wait.

Presentation is loading. Please wait.

July 2005 Mesh Agenda Authors: July 2005 Date: July 2005

Similar presentations


Presentation on theme: "July 2005 Mesh Agenda Authors: July 2005 Date: July 2005"— Presentation transcript:

1 July 2005 Mesh Agenda Authors: July 2005 Date: 2005-07-18 July 2005
doc.: IEEE /566r4 July 2005 July 2005 Mesh Agenda Date: Authors: Name Address Company Phone Donald Eastlake 3rd 111 Locke Drive, Marlborough, MA USA Motorola Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures < ieee802.org/guides/bylaws/sb-bylaws.pdf>, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE Working Group. If you have questions, contact the IEEE Patent Committee Administrator at Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola

2 IEEE 802.11s: ESS Mesh Networking Task Group
July 2005 doc.: IEEE /566r4 July 2005 IEEE s: ESS Mesh Networking Task Group TGs Motto: Perfection is achieved not when there is nothing left to add but when there is nothing left to take away. San Francisco, California 18-21 July 2005 Chair: Donald E. Eastlake 3rd Technical Editor: Steve Conner – Recording Secretary: Stephen Rayment Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola

3 Estimated General Flow of the TGs Meeting
July 2005 Estimated General Flow of the TGs Meeting Monday Afternoon Administrivia and Status of the Task Group Task Group Process Discussion and Development of Proposal Presentation and Selection Procedures Other Technical Presentations Tuesday Proposal Presentations Wednesday Votes on teleconferences/ad-hoc meetings Thursday Afternoon Summary Presentations of Proposals Ballot on proposals Donald Eastlake 3rd, Motorola

4 Monday Afternoon, 18 July 2005 Pacific LM Room, 16:00-18:00
doc.: IEEE /566r4 July 2005 Monday Afternoon, 18 July Pacific LM Room, 16:00-18:00 Call to Order Review of IEEE 802 and Policies and Procedures on Intellectual Property and Inappropriate Topics Attendance for San Francisco Meeting Approval of Minutes Minutes of the May 2005 Meeting, 11-05/535r1 Minutes of the Teleconferences held 16 June 2005 (11-05/613r0), 13 July 2005 (11-05/649r1) Approval of Agenda Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola

5 IEEE-SA Standards Board Bylaws on Patents in Standards
July 2005 doc.: IEEE /566r4 July 2005 IEEE-SA Standards Board Bylaws on Patents in Standards 6. Patents IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard. This assurance shall be provided without coercion and prior to approval of the standard (or reaffirmation when a patent becomes known after initial approval of the standard). This assurance shall be a letter that is in the form of either a) A general disclaimer to the effect that the patentee will not enforce any of its present or future patent(s) whose use would be required to implement the proposed IEEE standard against any person or entity using the patent(s) to comply with the standard or b) A statement that a license will be made available without compensation or under reasonable rates, with reasonable terms and conditions that are demonstrably free of any unfair discrimination This assurance shall apply, at a minimum, from the date of the standard's approval to the date of the standard's withdrawal and is irrevocable during that period. Approved by IEEE-SA Standards Board – December 2002, Reaffirmed May 2005 Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola

6 Inappropriate Topics for IEEE TG Meetings
July 2005 doc.: IEEE /566r4 July 2005 Inappropriate Topics for IEEE TG Meetings Don’t discuss licensing terms or conditions Don’t discuss product pricing, territorial restrictions or market share Don’t discuss ongoing litigation or threatened litigation Don’t be silent if inappropriate topics are discussed… do formally object. If you have questions, contact the IEEE Patent Committee Administrator at Approved by IEEE-SA Standards Board – December 2002 Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola

7 July 2005 Attendance Recording A sign-in sheet will be located at the 802 Concierge desk. Each member must sign-in “once” (1) per day, between the hours of 0700 and 1900 local time. Participants must “sign” by their name indicating their attendance. Attendance will be checked against other 802 groups. Those found abusing the honor system will loose ALL credit for that day. These sheets are provided daily. If you don’t sign up during the “regular sign-in” hours, you will NOT be given credit for that day. Donald Eastlake 3rd, Motorola

8 July 2005 doc.: IEEE /566r4 July 2005 Monday Afternoon, 18 July Pacific LM Room, 16:00-18:00 (continued) Review of Task Group Status, Donald Eastlake 3rd 35 intents to submit proposals received 9 brief proposal related presentations in March, 10 in May 15 proposal presentations and a ballot this meeting See 11-04/1430r12, 11-04/1539r3, 11-05/112r14, 11-05/274r8, r5. Presentations, Discussion, and Votes on Process “TGs Process”, Donald Eastlake 3rd, 11-05/662r0 “TGs Selection Procedure”, Juan Carlos Zuniga, 11-05/274r10 Other Technical Presentations Recess until 10:30 Tuesday Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola

9 Tuesday, 19 July 2005 Pacific LM Room, 10:30-12:30
doc.: IEEE /566r4 July 2005 Tuesday, 19 July Pacific LM Room, 10:30-12:30 Manual attendance reminder 10:34 Proposal C:6 Cooperative Protocol (11-05/602r3) 11:03 Proposal K:32 Samsung (11-05/569r0) 11:32 Proposal I:20 TBR (11-05/641r0) 12:30 Recess for Lunch until 13:30 Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola

10 Tuesday, 19 July 2005 Pacific LM Room, 13:30-15:30
doc.: IEEE /566r4 July 2005 Tuesday, 19 July Pacific LM Room, 13:30-15:30 Manual attendance reminder 13:34 Proposal H:9 Mesh Networks Alliance (11-05/600r0) 14:03 Proposal D:17 IPT Forwarding (11-05/601r0) 14:32 Proposal N:18 SNOWMesh (11-05/395r1) 15:30 Recess until 16:00 Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola

11 Tuesday, 19 July 2005 Pacific LM Room, 16:00-18:00
doc.: IEEE /566r4 July 2005 Tuesday, 19 July Pacific LM Room, 16:00-18:00 16:04 Proposal L:19 Siemens (11-05/593r0) 17:02 Proposal J:35 Proactive Mesh (11-05/588r0) 18:00 Recess until Wednesday 08:00 Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola

12 Wednesday, 20 July 2005 08:00 – 10:00 Manual attendance reminder
doc.: IEEE /566r4 July 2005 Wednesday, 20 July :00 – 10:00 Manual attendance reminder 08:04 Proposal E:5 Hybrid Mesh Routing (11-05/590r0) 08:33 Proposal O:29 Self Organizing (11-05/611r1) 09:02 Proposal A:8 Mesh DCF (11-05/594r0) 10:00 Recess until 13:30 Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola

13 Wednesday, 20 July 2005 13:30 – 15:30 Manual attendance reminder
doc.: IEEE /566r4 July 2005 Wednesday, 20 July :30 – 15:30 Manual attendance reminder 13:34 Proposal F:3 Dynamic Backbone (11-05/142r1) 14:03 Proposal M:22 Common Control Channel (11-05/610r0) 14:32 Proposal B:31 Wi-Mesh Alliance (11-05/574r0) 15:30 Recess until 16:00 Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola

14 Wednesday, 20 July 2005 16:00 – 18:00 16:04 Proposal G:7
doc.: IEEE /566r4 July 2005 Wednesday, 20 July :00 – 18:00 16:04 Proposal G:7 SEEMesh (11-05/567r0) 17:02 Discussion and Votes on Teleconferences/ad-hoc meetings “TGs Process”, Donald Eastlake 3rd, 11-05/662r1 Votes on teleconferences/ad-hoc meetings Other Technical Presentations Bob Moskowitz Recess until 18:00 Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola

15 Thursday Afternoon, 21 July 2005 13:30 – 15:30
doc.: IEEE /566r4 July 2005 Thursday Afternoon, 21 July :30 – 15:30 Manual attendance reminder Proposal 5 minute summaries (11-05/274r8) 13:34, C:6 Cooperative Protocol 13:39, K:32 Samsun 13:44, I:20 TBR 13:49, H:9 Mesh Networks Alliance 13:54, D:17 IPT Forwarding 13:59, N:18 SNOWMesh 14:04, L:19 Siemens 14:09, J:35 Proactive Mesh 14:14, E:5 Hybrid Mesh Routing 14:19, O:29 Self Organizing 14:24, A:8 Mesh DCF 14:29, F:3 Dynamic Backbone 14:34, M:22 Common Control Channel 14:39, B:31 Wi-Mesh Alliance 14:44, G:7 SEEMesh Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola

16 Thursday Afternoon, 21 July 2005 13:30 – 15:30
doc.: IEEE /566r4 July 2005 Thursday Afternoon, 21 July :30 – 15:30 Proposal Ballot (see 11-05/274r8, 11-05/662r0) Adjourn sine die TGs Motto: Perfection is achieved not when there is nothing left to add but when there is nothing left to take away. Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola

17 [Reference Information]
July 2005 [Reference Information] PAR for IEEE ESS Mesh: 11-04/54r2 Five Criteria for IEEE ESS Mesh: 11-04/56r1 Call for Proposals: 11-04/1430r12 Proposal Selection Procedures: 11-05/274r8 Proposal Intents: 11-05/112r14 Proposals: 11-05/597r5 Adopted Task Group Working Documents as of 1/19/2005 11-04/1477r4: Terms and Definitions for s 11-04/1174r13: Functional Specification and Scope 11-04/1175r10: Comparison Categories and Informative Checklists 11-04/662r16: Usage Models 11-04/1543r4: Informative Reference Bibliography for s Miscellaneous Graphs and Mesh, see r0 “Free the APs” Button Graphics: 11-04/518r0 Donald Eastlake 3rd, Motorola

18 [Earlier Minutes] Task Group “s” Meeting Minutes
July 2005 doc.: IEEE /566r4 July 2005 [Earlier Minutes] Task Group “s” Meeting Minutes May 2005 Meeting, Cairns, Queensland, 11-05/535r1 March 2005 Meeting, Atlanta, Georgia, 11-05/261r0 January 2005 Meeting, Monterey, California, 11-05/45r0 November 2004 Meeting, San Antonio, Texas, 11-04/1464r0 September 2004 Meeting, Berlin, Germany, 11-04/1125r1 July 2004 Meeting, Portland, Oregon, 11-04/853r0 Recent Teleconference Minutes 13 July 2005, 11-05/649r1 16 June 2005, 11-05/613r0 MESH Study Group Meeting Minutes May 2004 Meeting, Garden Grove, California, 11-04/652r1 March 2004 Meeting, Lake Buena Vista, Florida, 11-04/395r2 January 2004 Meeting, Vancouver, British Columbia, 11-04/110r2 Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola


Download ppt "July 2005 Mesh Agenda Authors: July 2005 Date: July 2005"

Similar presentations


Ads by Google