1 Progress Report By: Alex Hughes, Kevin Garcia, and Griffin Price
Austin Ridge Riders Progress Report By: Alex Hughes, Kevin Garcia, and Griffin Price

2 Summary A lot of progress has been made since the project proposal.
We have almost completed the map for Reimer’s Ranch, and we have started the digitization of Muleshoe Bend.

3 Scope The scope of the project has not changed since the proposal.
Provide detailed maps for club use, simple maps for rider use. Maps are to include trails, trail difficulty, elevation, emergency access points, important features, flood zones, etc. We plan to have both Reimer’s Ranch and Muleshoe Bend completed by December 7th

4 Rough Draft of the Reimer’s Ranch Map
Work Completed Reimer’s Ranch was digitized in Google Earth KML files were converted to layer files so they could be used in ArcMap. Map was created in Illustrator. Rough Draft of the Reimer’s Ranch Map

5 Present Work Digitizing Muleshoe Bend
Boundaries and some roads have been made. Adding flood zones to Reimer’s Ranch map Analyzing trail sustainability at Reimer’s Ranch

6 Work Scheduled Complete the Muleshoe Bend map in the same way the Reimer’s Ranch Map was completed. Project Phase Start Date End Date Digitalization 11/1/16 11/12/16 Data Analysis 11/13/16 11/19/16 Web and Map Development 11/20/16 11/26/16 Final Edits 11/27/16 12/6/16 Final Presentation 12/7/16

7 Problems Converting KML files to files that can be used in ArcMap
Using QGIS created more files than needed. Solution: Use KML to Layer tool in ArcToolbox.

8 Conclusion The last few features of the Map of Reimer’s Ranch are being added. Some problems have come up, but have been resolved. These solutions will allow the Muleshoe Bend map to go more smoothly. We expect to be able to complete the maps of Reimer’s Ranch and Muleshoe Bend by December 7th.