Download presentation
Presentation is loading. Please wait.
Published byOtto Mauno Nieminen Modified over 5 years ago
1
Update on legal issues Strategic Coordination Group
Update as of Maria Brättemark WFD Team, DG ENV.D.1, European Commission
2
Transposition of new acts
Groundwater Directive (2006/118/EC) Deadline : Notifications : Absent (CZ, DE, LU) Partial (BE, EE) Of these, reasoned opinions sent to : BE, CZ, DE(M4), EE, LU. Application to the Court : CZ, EE Floods Directive (2007/60/EC) Deadline ! Notifications received from Complete (DK, DE, IE, IT, LT, LV, MT, NL, RO, SI, SK, SE) Partial (BE, CZ, LU, UK) 20 letters formal notice sent on to and still absent or partial : AT, BE, BG, EE, FI, EL, ES, FR, CY, HU, PL, PT. Reasoned opinions : ES, HU, MT, CY, EL (M4) EQS Directive (2008/105/EC) Deadline Notifications received from : Full ( NL, IE ) Partial (LV, UK) Directive on chemical analysis (2009/90/EC) Deadline
3
Non-conformity Directive 2000/60/EC Non-conformity cases :
Letters of Formal Notice sent, and case still open (BE, BG, CZ, DE, DK, EE, ES, FI, FR, IE, IT, NL, PL, RO, SK, SE, UK) Cases closed : SI, LV, HU, LT Additional Letter of Formal Notice : DK, EE, SE Reasoned Opinion : CZ, FR, RO, ES Follow up under consideration : BE, DE, FI, IE, NL, PL, SK, UK Late transposition under review : LU Water services still an issue of concern… some cases frozen apart from Water Services. Directive 2007/60/EC and 2006/118/EC : Conformity assessments have started. 3
4
River Basin Management Plans State of play - 4 May 2010
Reminder of deadlines : : start of consultations draft RBMP : publication of RBMP : Reporting to the Commission Published : AT, BG, CZ, DE, EE, FI, FR, IT, LU, LV, NL, SE, SK, UK Adopted and not yet published : IE, HU, PL, RO + NO Consultation status : Member States consultations still ongoing : DK, SI, LT. Partial consultation : BE (1 out of 4), ES (22 out of 24) not started ! Not yet started ! EL, PT , CY (May-Nov 2010) MT(May-Nov 2010), 4
5
State of play RBMP adoption and WISE reporting
MS RBMP adopted WISE reporting RBMP reported XML GIS AT J L ES MT BE K FI NL BG FR PL CY HU PT CZ IE RO DE IT SE DK LT SI EE LU SK EL LV UK NOTES: Status: 04/05/2010 The column “RBMP adopted” reflects the contents of DG Environment’s web page: GREEN - River Basin Management Plans adopted! YELLOW - consultations finalised, but awaiting adoption. RED - consultation have not started or ongoing. The WISE reporting columns reflect if largely complete (green), partial (yellow) or no reporting (red) has been done on the three parts expected: - Copies of the RBMP and PoM XML files GIS files If the plan has not been yet been finalised and adopted it is assumed that the information submitted in WISE reflects draft plans.
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.