1 Tyler Butikofer Associate Engineer II
ADS 2028 Phase 1 V ADS 2028 Phase 2 V1.1 Tyler Butikofer Associate Engineer II Western Electricity Coordinating Council

2 Western Electricity Coordinating Council
ADS 2028 Phase 1 V2.1.1 Updates Starts with ADS V2.0 Northwest wheeling rates updated Updated AZPS hourly load profile Made all nuclear units must run Alberta co-gen units non-spill Remove duplicate Alberta generators EPE general edits Klondike Wind III and Nine Canyon Wind capacities updated Western Electricity Coordinating Council

3 Western Electricity Coordinating Council
ADS 2028 Phase 2 V1.1 Updates Starts with ADS 2028 Phase 1 V2.1.1 Retires 3,276 MW of thermal generation Adds 4,906 MW of generation Wind: 2138 MW Solar: 2093 MW Battery Storage: 100 MW / 400 MWh Internal Combustion: 189 MW Western Electricity Coordinating Council

4 Generation Changes (Both cases have the NW wheeling changes)
Western Electricity Coordinating Council

5 Western Electricity Coordinating Council
Dump Energy (MWh) Region ADS 2028 Phase 1 V2.0 ADS 2028 Phase 1 V2.1.1 (Includes NW wheeling changes) ADS 2028 Phase 2 V1.1 (Includes NW wheeling changes) Phase 2 V1.1 - Phase 1 V2.1.1 AESO 92,715 75,782 89,884 14,102 BCHA 3,806 7,363 10,217 2,854 CAISO 420,990 1,295,907 1,404,181 108,274 ColumbiaGrid 53,457 52,424 61,596 9,171 NTTG 86,250 109,611 161,710 52,099 WestConnect 83,304 126,578 221,196 94,618 Total 740,522 1,667,665 1,948,783 281,118 Western Electricity Coordinating Council

6 Regional Transfers (Both cases have the NW wheeling changes)
Western Electricity Coordinating Council

7 ADS 2028 V2.1.1 Sensetivity (Unchanged NW Wheeling Rates)
Ran sensitivity reverting back to the same NW wheeling rates as ADS 2028 V2.0. All other data and modeling assumptions remain the same as ADS 2028 V2.1.1 Western Electricity Coordinating Council

8 Dump Energy Changes Due to NW Wheeling Charge Changes
Region ADS 2028 Phase 1 V2.1.1 (Unchanged NW Wheeling Rates) ADS 2028 Phase 1 V2.1.1 (NW Wheeling Rates Set to Zero) Phase 1 V2.1.1 Wheeling Zero - Unchanged AESO 69,070 75,782 6,712 BCHA 7,315 7,363 48 CAISO 502,804 1,295,907 793,103 ColumbiaGrid 59,874 52,424 -7,450 NTTG 89,081 109,611 20,530 WestConnect 94,413 126,578 32,166 Total 822,558 1,667,666 845,108 Dump energy increased in Southern California and decreased in Northern California Western Electricity Coordinating Council

9 Regional Transfers NW Wheeling Changes
Western Electricity Coordinating Council