Presentation is loading. Please wait.

Presentation is loading. Please wait.

WNG SC Agenda Authors: July 2009 Date: March 2009

Similar presentations


Presentation on theme: "WNG SC Agenda Authors: July 2009 Date: March 2009"— Presentation transcript:

1 WNG SC Agenda Authors: July 2009 Date: 2009-07-17 March 2009
doc.: IEEE /0367r0 July 2009 WNG SC Agenda Date: Authors: Name Address Company Phone Tk Tan 2121 Ringwood Ave, San Jose, CA 95131 GCT Semiconductor Tk Tan, GCT Semi Stephen McCann, RIM

2 March 2009 doc.: IEEE /0367r0 July 2009 Abstract Closing report for Wireless Next Generation (WNG) Standing Committee (SC) for July 2009, San Francisco, California Tk Tan, GCT Semi Stephen McCann, RIM

3 Presentations Session 1 (Tuesday AM1)
March 2009 doc.: IEEE /0301r1 July 2009 Presentations Session 1 (Tuesday AM1) Energy Consumption and Policy - Nordman 2 - QoS for Management Frames – Montemurro 11-09/0817r0 in TVWS – Kennedy wng in-the-tvws.ppt Session 2 (Wednesday PM1) 4 - Enhancement Technology for vehicular communications – Cho wng-enhancement-technology-for-vehicular-communications.ppt 5 - WLAN Public Easements – Paine wng-public-easements-for ppt 6 - Enhanced Security for i – Harkins wng-enhanced-security.ppt 7 - Broadband V2I Access for High Speed Transportation – Morioka wng-broadband-v2i-access-for-high-speed-transportation.ppt TK Tan/GCT Semi Stephen McCann, RIM

4 July 2007 July 2009 doc.: IEEE /xxx2r0 July 2009 Motion Request approval by IEEE 802 LMSC to form an Study Group to Address QoS for Management Frames [as described in doc 11-09/0817r1] with the intent of creating a PAR and five criteria. By: Michael Montemurro Second: Cam-Winget [WNG Result: 34 – For; 3 – Against; 14 – Abstain.] Slide 4 Tk Tan, GCT Semi Page 4 Donald Eastlake 3rd, Motorola McCann et al. (RIM)

5 July 2009 Motion Moved: Because of its suitability as a primary candidate for a TVWS technology, and in the expectation that the FCC and Ofcom will clarify their requirements for the database in the interim, the WG should begin a Study Group to develop PAR and 5 Criteria documents for approval by the EC at the Atlanta Plenary in November 2009 By: Rich Kennedy Second: Harry Worstell YES: 39 NO: 0 ABSTAIN: 15 Tk Tan, GCT Semi


Download ppt "WNG SC Agenda Authors: July 2009 Date: March 2009"

Similar presentations


Ads by Google