Proposed actions for gtr development
2011 2012 2013 E-Lab action Validation 2 Confirmation Round Robin test sequence Parameter set Procedure for V2 Draft gtr1 Draft gtr2 Modify gtr WLTC completed reflection Short V1 Confirmation Validation 2 Round Robin [ Background ] 1. Draft gtr 1 is the portion exclude Validation phase 2. 2. Some of open issues need to be evaluated during the validation program. 3. Draft gtr 2 is reflected the result of Validation 2 .