Presentation is loading. Please wait.

Presentation is loading. Please wait.

The South African Human Rights Commission

Similar presentations


Presentation on theme: "The South African Human Rights Commission"— Presentation transcript:

1 The South African Human Rights Commission
Meeting with the Portfolio Committee on Justice and Constitutional Development 11 September 2012

2 Contents Enhancing the working relationship between the SAHRC and Parliament Quarterly meetings Informal meetings Joint meetings with the Portfolio Committee OISD The SAHRCs reporting obligations to Parliament How can the SAHRC report more effectively to Parliament Parliament’s role in assisting the Commission with its reporting obligations PAIA reporting obligations and challenges Funding requirements Towards an ideal budget Sharing resources with Chapter 9 institutions How can Parliament support the SAHRCs request for additional funding? Enhancing the role of Commissioners Conditions of Service The impact of Commissioner Baai’s death Human Rights Commission Act

3 Additional Funding Proposal
Presentation to the Portfolio Committee on Justice and Constitutional Development 11 September 2012

4 Contents The Big Question Analysis of the Current Context
Cutting spending over the medium to long-term Analysis of the Current Context Acknowledging the fiscal challenges Performance information Radical (but Realistic) Recommendations Chapter 9s working together Greater collaboration = effective and efficient institutions The Plan Assistance from Treasury Political buy-in

5 The Big Question Cutting spending over the medium to long-term
Savings and reprioritisation within the MTEF baseline Priorities to be accommodated through reprioritisation 1%, 2%, 3% baseline deductions Impact of reprioritisation and baseline reduction on outputs Proposals for long-term savings How do you plan to cut spending over the medium to long-term?

6 Analysis of the Current Context Acknowledging the challenges faced by National Treasury
The tax to GDP ratio has remained unchanged at 24.5% from 2009/10 to 2010/11. The ratio has been decreasing over the last several years from a 27.6% high in 2007/08 to the current 24.5% as a result of the global financial crisis when revenue contracted. The reduction is mainly due to contribution of CIT as a percentage of GDP which declined from 7.2% in 2008/09 to 5.5% in 2009/10 and further to 4.8% in 2010/11.

7 Analysis of the Current Context Why Treasury’s approach is wrong
1%, 2%, 3% results in a piecemeal approach to cutting spending Spending cuts = cuts in essential services Cutting services reduces organisational effectiveness A more holistic approach is required

8 Analysis of the Current Context Why Treasury’s approach is wrong
Baseline Reduction 2013/14 2014/15 2015/16 R’000 Consultants 597.96 627.86 659.26 Recruitment costs 482.04 - Agency and support / outsourced services 745.25 782.51 Office rentals and leases 916.89 2,151.23 TOTALS 1, 2,290.00 3,593.00 RTT process started in 2010 Advocacy Research Legal Services

9 Analysis of the Current Context Why Treasury’s approach is wrong
Baseline Reduction 2013/14 2014/15 2015/16 R’000 SAHRC 1,080.00 2,290.00 3,593.00 CGE 600.00 1,000.00 1,050.00 PPSA 1,899.00 4,100.00 6,434.00 CRL Rights 325.00 699.00 1,117.00 TOTALS 3,904.00 8,089.00 12,194.00 Reprioritisation

10 Analysis of the Current Context Acknowledging the challenges faced by Human Rights Commission

11 Radical (but Realistic) Recommendations for cutting spending
10% of our budget is spent on rentals Large meeting areas are used 15% of the working day Current building layout results in almost all staff having an office Similar challenges faced by other C9s

12 Radical (but Realistic) Recommendations for cutting spending

13 Radical (but Realistic) Recommendations for cutting spending – C9 House

14 Radical (but Realistic) Recommendations for cutting spending – C9 House

15 The Plan Working together to cut costs and improve performance
5 Polokwane 25 Municipal Offices 3 Rustenburg 1 Mabopane 1 Siyabuswa 5 Nelspruit 1 Mmabatho 2 Pretoria 1 Centurion 19 Municipal Office 2 Mafikeng 7 JHB 18 Municipal Offices 1 Vryburg 1 Potchefstroom 1 Kuruman 51 Municipal Offices 2 Upington 1 Newcastle 1 Phuthaditjhaba 20 Municipal Offices 4 Kimberley 1 Pietermaritzburg 6 Bloemfontein 4 Durban 1 Westville 27 Municipal Offices 1 Umtata 1 Bisho 39 Municipal offices 28 Municipal Offices 4 East London 2 Port Elizabeth 6 Cape Town 1 George

16 The Plan Working together to cut costs and improve performance
100% target will be reached in 2014/15 (AG Performance Audits) Ideal budget: R140 million in 2013/14 and R157 million in 2014/15 Increases required for two more financial years before spending cuts can be considered In 2015/16 guaranteed, pre-approved budget cuts can be implemented

17 The Plan The ideal budget 2013/14
Budget Item Amount Approved MTEF allocation for 2013/14 R108,000,000 Additional amount requested R32,808,080 Legal Services Programme Legal services capacity for complaints handling R12, 309, 000 Internal capacity building of legal practitioners R1,500,000 Litigation of complaints R1,500, 000 Revamping Legal Case Management System R2,130,000 Setting-up a call centre for complaints processing R1,700,000 Human Rights Advocacy Programme Developing Advocacy capacity and materials R1,600,000 Research Research reports R1,945,000 Promotion of access to information Monitoring, compliance and advocacy of PAIA R6,694,080 IT Infrastructure R3,430,000 IDEAL BUDGET REQUESTED R140,808,080

18 The Plan Working together to cut costs and improve performance
Ideal Budget Estimates 2013/14 2014/15 2015/16 R’000,000 SAHRC 140.00 157.00 170.00 CGE 73.00 74.00 78.00 PPSA 248.00 259.00 273.00 CRL Rights 30.00 36.00 40.00 TOTAL BUDGET 491.00 526.00 561.00 TOTAL SAVINGS 4.00 8.00 12.00

19 The Plan Working together to cut costs and improve performance
Ideal Budget Estimates 2013/14 2014/15 2015/16 R’000,000 SAHRC 140.00 157.00 170.00 150.00 CGE 73.00 74.00 78.00 70.00 PPSA 248.00 259.00 273.00 260.00 CRL Rights 30.00 36.00 40.00 32.00 TOTAL BUDGET 491.00 526.00 561.00 512.00 TOTAL SAVINGS 4.00 8.00 12.00 37.00

20 The Plan Towards a win-win situation
Closer cooperation between C9s Positive knock-on effects e.g. reduced security costs, shared personnel, collaboration, IT infrastructure, one-stop service for clients Purchasing power – optimum use of technical support teams e.g. IT helpdesk, travel desk Treasury reduces budgets of C9s by between 9%-12% over 3-5 years Full political buy-in from all stakeholders

21 The Plan Working together to cut costs and improve performance
Exploratory teams to be formed in each C9 institution Feasibility study conducted by National Treasury or supported by National Treasury Pilot projects in provincial offices Medium-long term view Support from Parliament

22 The South African Human Rights Commission


Download ppt "The South African Human Rights Commission"

Similar presentations


Ads by Google